Telescopic-Boom-Lift-GTBZ36,-GTBZ38Z

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Excuse me, what is the meaning of the construction team Jixietaiban? What is the meaning?
Mechanical engineering work eight hours a day. Known as a machine called a team working a shift, two machines working a shift or a machine work in two shifts of two classes called down and so on!
Q:Where are the second-hand machinery and equipment acquisition?
The main products of the machinery industry are agricultural machinery: tractors, seeding machines, harvesting machinery, etc.. Heavy mining machinery, metallurgical machinery, mining machinery, lifting machinery, handling machinery, mining equipment, vehicles, cement kiln equipment. Engineering machinery: forklift, earthmoving machinery, compaction machinery, concrete machinery etc..
Q:Please tell me how to use the multimeter to measure those aspects when the working circuit of construction machinery is out of order
This can be measured with a multimeter. The control part also checks the power supply before switching on. Is the voltage normal?. It can also be tested with a multimeter. In the control section, you can also use a multimeter for troubleshooting. It would be better if you had an oscilloscope.
Q:Use of construction machinery
The pump is pumping system will be installed in the car, and can be received by a development boom as the transmission channel, will be transported to the vehicle concrete buildings. Such as towers, pump truck can take mixer (concrete truck mixer) which mixed concrete is delivered directly to the 56 storey building. Of course, or higher. Can also be transported to the lower level, such as the foundation.
Q:Undergraduate engineering machinery major to learn what software ah?
According to the teaching plan, can also learn such as: the principle and application of micro computer system, information theory and application, PIC MCU interface technology and system design, the principle and application of DSP device, and automatic control principle, and application of random signal processing, statistical signal processing.
Q:What are the concrete construction machinery?
Mixing truck (247) pump (162) side dump concrete truck (32) rail type mixer (9) semi trailer (11) bulk cement truck (17) dry mortar transport equipment (20) mounted concrete pump (53) cloth rod (19) other pumping machinery (63) the spray machine (10) pouring equipment (4) air chute delivery system (8) pneumatic lift system (3) bin pump system (7) chain conveyor (5) screw conveyor (11) high speed elevator (16) high bucket chain hoist building (20) (37) the belt conveyor (15) powder conveyor (7) crane (38) concrete feeding equipment (72) loader (31) cloth car (3)
Q:The difference between energy-saving and other frequency station
The difference in people, steel men dare to struggle, responsible for the seller and the seller
Q:If I use Mobil Steyr engineering machinery oil, the most suitable collocation way??
Engineering machinery with black Mobil Steyr 15W40 fighter CG-4 OK
Q:What are the differences between loaders, gearboxes and other brands of loaders manufactured by Shandong construction machinery?
Product upgrades our wheel loader by "seventy-two" source: Author: click on: 10062008 years, energy saving, safety, comfort and easy maintenance features of wheel loader has been more concern in the industry
Q:What about the title of Mechanical Engineer?
The second basic examinations are divided into 2 half day, each for 4 hours. Professional examination is divided into professional knowledge and professional case two parts, each part content is 2 half day, each half day is 3 hours. Article third in line with the "mechanical design registration Machinery Engineer System Provisional Regulations" eighth requirements, and has one of the following conditions, may apply for the basic examination:

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range