TCT6014 (8T) Topless Tower Crane From CNBM

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6 Maximum Lifting Height(M): 200m Rated Loading Capacity: 6
Span: 70 Rated Load Moment: 70

Product Description:

Product Description:

The 6t climbing building construcion tower crane construcion tower crane in china features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system.

Main Product Features:

1.       Widened equipment capacity and working scope.

2.       Suitable for the groups of tower cross framework.

3.       Noise relief stability with and combination amplitude range.

4.       Can sustain height adjustment for occasional exceptional height construction procedures.

5.       Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Product Specifications:

Minimum Order Quantity:

1 set

Unit:

set

LoadingPort:

Chinamain port

Supply Ability:

1000 set/month

Payment Terms:

TT OR LC

Package:

set

 

 

 

 Product Images:

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

tower crane Specifiction

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it difficult to test tower cranes?
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission
Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
What is the total power of tower cranes of type 63 and 40?
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q:How to build a tower crane?
Nowadays, most tower cranes used in construction sites have self lifting function, but they can not leave the coordination of cranes when they are installed.Here's the tower crane installation:1, track laying: few walking tower crane, if the working position is not changed in a stage, rail crane fixtures will be locked.Some tower cranes have no running wheels, and the tower cranes are installed directly on the required basis.2. Install the tower crane chassis parts: installation requirements, installation, and placed in the location of the weight block.3. Install the basic tower, revolving parts and tower cap.Each tower crane has the basic height of the tower installation, the installation height of the rotating device and tower cap, these work is the use of sufficient lifting capacity of the car crane to complete.
Q:What is the wall radius of a qtz50 tower crane?
The working radius is usually 50 meters. There are also 48, 49 meters. For example, 4810, 4910, and 5010, belong to 50 tons of tower cranes.Qtz50 resolves to:Q: crane;T: Tower type;Z: Jack up;50: lifting torque of 50 tons meters.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:What is the difference between lifting height of tower crane and independent height?
Attachment can be understood as the kind of tower crane tied to a building. Without it, the tower will fall, and its strength, stiffness and stability can not be satisfied.
Q:What does "jack up" tower crane 1000KNm mean?
1000KNm means that the rated lifting moment of the tower crane is 1000KNm. That is to say, the 100tm tower crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range