TCT6014 (8T) Topless Tower Crane From CNBM

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6 Maximum Lifting Height(M): 200m Rated Loading Capacity: 6
Span: 70 Rated Load Moment: 70

Product Description:

Product Description:

The 6t climbing building construcion tower crane construcion tower crane in china features stable operation and reliable management due to the adoption of various advanced technologies. It is configured with diverse devices like the hydraulic self-propelling device, frequency converting slewing device and a series of reliable safety devices like hoisting height limiter, slewing range limiter and multifunctional limiter. It is thus easy for this heavy lifting equipment to control the hoisting capacity, load moment and trolley traveling range more precisely. Additionally, multiple electric safety devices such as anemoscopes and obstacle lights effectively prevent the breaking of trolley axles and wire ropes.

 

The PLC (Programmable Logic Controller) adopted by our aerial equipment can timely diagnose the cause of breakdowns. The frequency converter easily realizes continuously variable speed regulation and greatly improves the stability, reliability, and operability of the control system as well as the work efficiency of the flat top tower crane. In addition, the electric components are introduced from world-class enterprises including Omron, YASKAWA, Schneider (TE) and MEAN WELL. They ensure a low failure rate of the electric control system.

Main Product Features:

1.       Widened equipment capacity and working scope.

2.       Suitable for the groups of tower cross framework.

3.       Noise relief stability with and combination amplitude range.

4.       Can sustain height adjustment for occasional exceptional height construction procedures.

5.       Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Product Specifications:

Minimum Order Quantity:

1 set

Unit:

set

LoadingPort:

Chinamain port

Supply Ability:

1000 set/month

Payment Terms:

TT OR LC

Package:

set

 

 

 

 Product Images:

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

tower crane Specifiction

QTZ5013A Tower Crane QTZ5613 Used Tower Crane

FAQ:

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:1000 origami cranes?
They can be made of anything, and they can vary in size, so you're okay.
Q:Is Maggie by Stephen Crane an easy book to read?
Stephen Crane, Maggie is fantastic! I read it in school when I was 14 so I have no doubt you will have no problems in reading it. Maggie is the tale of an inevitable fall from grace on the part of a young, innocent girl trapped in the vicious world of New York City's slums. Yearning for acceptance and love, beaten at home by alcoholic parents, Maggie sets out with Pete, a local bartender whose cultured mannerisms elicit great respect from the impressionable young girl. However, when Pete spurns her for another, Maggie is ejected out onto the street, forced into prostitution to make a living. We last see her moving off, a huge, oily fat man in tow, for a darkened corner in the city's seedy underworld. If Upton Sinclair's The Jungle is a torrent of social anger and protest, Crane's Maggie is like a brilliant lightning strike, flashing across our vision and leaving us temporarily blinded. The book--scarcely 70 pages--is succint, brutish, and merciless. Crane allows his readers to form their own opinions regarding the characters. His innovative use of near-phonetic spelling to depict in the reader's ear the local dialect of New York's rough neighborhoods was shocking and difficult to comprehend when the book was first released. It lends Maggie an air of earthy legitimacy. Ultimately, Maggie is a cry for the plight of poor children--the souls we overlook with a callous unease mirrored in Pete's offhand, uncaring rejection of young Maggie's genuine love and affection. It is, without qualification, Stephen Crane's greatest and most moving achievement.
Q:How did the tower crane rise on the construction site? Fifteen
With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
Q:Under what circumstances are winches used and under what circumstances tower cranes are used?
1, this depends on the specific construction organization design, the general height of less than 20 meters, all with the hoist.2, the framework of the structure, four, 18 meters, construction area, if large, with tower cranes, of course, labor-saving, time-saving and rapid progress, if the construction side agrees, it is best to use tower cranes.3, artificial wages are too high, the project is big, with the winch is not worthwhile, progress can not catch up, workers are also big grievances. The track type tower crane is usually used in shipyard or fixed freight yard.
Q:What is a better name than Frank Crane for a story hero?
I agree with the first poster that you are doing something very wrong. Rather than worrying about the name you may want to reconsider the gender.
Q:please advise which type of air condition is powerful for electric crane on ship ,?
confident. Ships use a complicated gadget of chilled water loops, fan rooms and ducts. additionally some areas have further fan coil instruments to maintain cool. while it truly is all working astonishing, it truly is comfortable. in specific circumstances while the sea water temperature is extremely heat and the climate is blistering warm the gadget struggles to maintain up and it gets extraordinarily heat. different areas on the deliver are only infamous for being warm. areas close to the steam catapults on companies, the scullery the place dishes are washed, and a few engineering areas are only constantly freakin' warm. In those areas the warmth rigidity stages are monitored and there are set sessions for how long you could competently paintings in that area.
Q:Need to make a wooden crane.?
Wooden Crane Toy
Q:Equipment safety of tower crane
Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
Q:airsoft m4 full stock, to crane stock?
M4 Crane Stock
Q:why do we see cranes on a golf course during a tourmanent?
Yes Best of luck with it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range