Product Description:

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.


2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.


3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.


5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images









Tower crane Specifiction


FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.


2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

About CNBM

CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Breifly explain the brake system in the lifting devices ex. Over head crane?
Cranes work using hydraulics and cables. The cables are wrapped around pulleys and the pulley is turned using hydraulic power. The brake system is simply stopping the pulley from turning by reducing power. The hydraulic system typically will turn a series of gears which in turn spins the pulley that the cable is wrapped around. It's different than a brake system say on a car where when you hit the brakes, pads squeeze on the interior of the wheel rim slowing it down. Cranes you just reduce power and stop the pulley from turning. They also have emergency stops. Older cranes have wedges that would be released onto the cable and then the wedges would grab the cable and slip into a ring. The narrow end of the wedges would slip into the ring first and then as the wedges increased in diameter the grip on the cable would get tighter and then stop the cable from moving. They also have systems on the pulleys to stop the pulley from spinning. They essentially work the same way as a car break. When the emergency brake is triggered, pads will squeeze on the rim of the pulley to stop it. These mechanisms work by friction. They could also have holes around the pulley and a steel pin would be pushed into one of the holes to stop it from spinning. Of course if the force of the weight exceeded the strength of the pin, it would shear.
Q:In designing an overhead travelling crane what are the engineering limits on lift capacity .?
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q:Crane Style Kung-Fu?
look man to learn the 5 animals stuff, u can't do it by urself !! u need reflex and you can't have it unless some1 teaches you some techniques !! well actually i wanted to learn Kung fu so i started learning it from the internet !! well there is a time i thought that i new almost everythng and was perfect at it ((that was how i saw myself !!)) but when i got into a Kung fu club i coudn't keep up with them !! so if you want to learn the real techniques you should go to a school or something !!!
Q:Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
The type of "QTZ100" indicates the hoisting tower crane with nominal lifting torque up to 1000KN.m;5610, 5613, 6015 and so on model meaning is, the first 2 digits indicate effective variable amplitude length, the unit is m, and the latter 2 for the largest amplitude of gravity, the unit is KN.These two models do not have any objections, can be converted, not the latter way of expression is more reasonable, and by the current domestic manufacturers widely used.TC5610 nominal lifting torque to 630KN.m, but not up to 800KN.m, so it should be considered QTZ63 series.TC5613 nominal lifting torque reached 800KN.m, but not 1000KN.m, so divided into the QTZ80 series.TC6015 nominal lifting torque reaches 1000KN.m, so it is divided into QTZ100 series.
Q:How much height should tower crane work at M?
Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:How much is an origami crane and other models?
Since the crane is such a basic figure, and anybody who's interested in origami can make it for themselves, you probably couldn't sell them. Maybe you might be able to sell some of the more complicated models, but I can't think you'd get much for them. There's no market.
Q:Blue Heron, Crane, or Egret?
ive seen blue herons here in maine they are garyish with long legs and beeks they stand very still so they can catch there food with long beeks
Q:Hunger Games Question: Why is Seneca Crane important enough to be in the movie?
Seneca Crane was the game maker of the 74th hunger games and let two tributes win aka Katniss and Peeta. Seneca Crane was the executed because of that because the capitol felt like having two tributes win was a defeat for the capitol because it showed that the capitol lost control and therefore can't completely control everything..which was what all districts were used to at the time, or at least until Katniss and Peeta 'rebelled'. From a film aspect, Seneca Crane is important because they might use him to advance the plot and Crane might also be a huge transition piece from the first movie to the next (since he was kind of the reason for fueling the flames of the rebellion). I LOVED Madge too, and I am not entirely sure why they left her out, though she seemed important in the book she really wasn't. She only gave the symbol of the rebellion and helped Katinss here and there, but she wasn't really a plot advancing character...I mean anyone could have helped Katniss and given her the mockingjay...most likely Cina will be giving her the pin in the movie because he is Katniss' stylist. TEAM PEETA RULES!!!!!!!
Q:Is there a crane lifting chart where I can enter info. to determine what size crane I need, if so where?
Sorry, it's not quite that simple.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range