TCD4021 8T Luffing Tower Crane with CE ISO Certificate

Ref Price:
$10,000.00 - 100,000.00 / set
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 set
Supply Capability:
1000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of TCD4021 8T Luffing Tower Crane with CE ISO Certificate

1, TCD4021 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 40m, TCD4021 tower cranes are famous for their large operating ranges, varied working methods and wide uses. 

2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3, It is original in design, reliable in operation and satisfactory in shape.

4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.

5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products

Main Features of TCD4021 8T Luffing Tower Crane with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

Tower crane Specifiction TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

TCD4021 8T Luffing Tower Crane with CE ISO Certificate

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do they use cranes at +600 meters hight to build a building like the Burj Khalifa?
The cranes are jack-up cranes. They have their own self-contained jacks. As one floor is completed, they jack up to the next level. The cranes are on top of the buildings. They are designed by structural and mechanical engineers to loift a given weight.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
The maximum amplitude control: when the weight exceeds or prohibit increase load rate of more than 105% or greater than the maximum amplitude (amplitude limit) output control, allowing the car to be near range by car distance to increase amplitude is prohibited.Minimum range control: when the amplitude is less than the minimum amplitude (amplitude lower limit), the output control allows the car to move to a distant range, i.e., to increase
Q:How were Railroad Steam Engines from 1830 to 1890's recovered before the advent of the Wrecker Steam Crane.?
Old Man Dirt is right. Block and tackle. Remember too those early engines weren't that heavy. The most common type from 1850 to the 1890s was the 4-4-0. They, and the other types were usually between 25 and 60 tons. I don't necessarily collect old rail photos, but I've seen many hundreds in other people's collections. And early locomotive salvage was usually block and tackle, with another engine brought in to furnish the muscle required. Since this could be a lengthy process if the wreck was extensive, a temporary track, or sometimes called a shoo-fly would be built to move trains past the derailment, or to enable getting another engine and hoisting equipment positioned.
Q:The role of slewing limiter in tower cranes is limited
The function of the rotary limiter is to limit the large arm to a certain set stop. Protect from turning to danger settingThe function of the amplitude limiter is to restrict the car to come out or return somewhere to stop and protect the car from or within certain dangerous range.The hook safety device is to prevent the wire rope from falling out of the big hook, so as to avoid falling and other dangerous events!
Q:Similarities in theme with Emily Dickinson and Stephen Crane?
?
Q:How come you never see cranes being transported from one site to another?
because they move so slow its hard to tell if there moving or not.
Q:a crane lifts load of 500kg mass to a distance f 20m in 10s at a constant velocity. how much work is done?
a lot
Q:What is the most effective way to kill a Crane Fly (Daddy Long Legs)?
a daddy long legs interior the united statesis a sort of spider with an extremely small around physique and intensely long 8 legs. interior the united kingdom, Australia, and Canada crane flies are noted as daddy long legs. So what you ought to have seen could have been a crane fly and it could have been a spider. The crane fly has an elongated physique, six legs, and wings. It sounds like a good sized mosquito.
Q:How to understand a Mobile Crane Load Chart?
Hello, Briefly, the structure of the crane or lifting mechanism is not usually the limiting case. The limiting case is to ensure that the Center of Gravity of the mobile crane with the load is such that it is bound within the tires or footprint of the crane. If this load is outside the footprint, the crane tips over.
Q:How can I work as a crane operator in France?
Me too(NCCCO) how long for you? What do you run? I run a Terrex/demag a/c 140, Grove TMS 870, and a little national 40 ton. Anyway, sorry I don't have an answer but the other day just for kicks I was looking around to see what's going on and searching crane operator+job and there's a huge worldwide company, slips my mind but they kept coming up all over hiring operators all over the world. Give that a try, if I was single I'd be going everywhere, and getting PAID to do it but my wife and kids mean too much to be away. Try this.... search crane service+france email some crane outfits and ask around, it can't hurt.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range