• TC7034 tower crane/ tower crane with CE ISO certificate System 1
  • TC7034 tower crane/ tower crane with CE ISO certificate System 2
  • TC7034 tower crane/ tower crane with CE ISO certificate System 3
  • TC7034 tower crane/ tower crane with CE ISO certificate System 4
TC7034 tower crane/ tower crane with CE ISO certificate

TC7034 tower crane/ tower crane with CE ISO certificate

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

About Us

Based on strong design and R&D ability, CNBM-CMAX brand machinery has provided key technical supports to the mechanization of construction materials. CNBM-CMAX machinery covers not only construction machinery, such as excavators, loaders, road roller and etc, but also lifting machinery, such as tower cranes, building hoist, suspended platform, mobile crane and etc; not only the metal processing machinery, such as stainless steel cold-formed steel production line, door molding machine, roof tiles and wall board forming machine and C, Z-type machine, but also a variety of specialized production line, such as EPS sandwich panel production line, FRP pipe production line; what’s more, special machinery, such as hydraulic jacking bridge used in cooling tower construction together with the multifunctional hoist and the only cement paper bag production equipment in Chinese domestic market. CNBM provides you complete solutions and excellent service.

TC7034 tower crane/ tower crane with CE ISO certificate

TC7034 tower crane/ tower crane with CE ISO certificate

TC7034 tower crane/ tower crane with CE ISO certificate

TC7034 tower crane/ tower crane with CE ISO certificate


Q:Military Action movie with bunch of cranes at the end?
Cranes like construction equipment or Cranes like the birds?
Q:do they get the concrete blocks up that hang at the end? Do they use another type of crane to assemble them?
Tower cranes assembly starts with the foundation of the crane with lot concrete blocks for fixing, then they fix the first bottom part of the crane then they fix the boom with the counter weights, when they want to extend the height, they fix a jack up machine which lift up the boom and then insert a vertical piece and so on till they reach the required height. During the first installation they use a small mobile crane and then after the crane it self lift and fix the pieces
Q:Recently, it seems that any time my front door is open for any period of time, crane flies start migrating inside. I would like to find a way to keep them out when the door is open. Are crane flies attracted to electric bug zappers?
I'm sure they are, but keep it away from your house or you're going to be attracting more bugs and have them dead near your house.
Q:I watched a man climb one once and he wasn't secured. Crazy. How much do they get?If there are any operators on here, do you get scared when you climb up/down?
1. No need to be secured, the ladder inside the crane tower has many platforms. It's actually a heap of ladders and platforms not a single ladder. Usually the ladder is surrounded by a cage that would catch you if you fell. Once at the top there are handrails everywhere, you just make your way to the cabin. 2. Average here in Australia is about 1500 to 2000 non union and 2500 to 3000 union. 3. Not worried climbing but if there is a thunderstorm and you are in the cabin it can be scary 4. You shouldn't climb the crane when it's rainy as its all steel it is slippery if wet but sometimes it cannot be helped. You should wear non slip boots too
Q:As a building gets taller, the crane is raised. How is this done? And when the building is done, how do they get the crane back down?
they use a process called jumping. iron workers use a special fixture to unbolt the tower and lift the crane up high enough to slide in another section and bolt it down. breaking down of the crane goes in reverse order.
Q:I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
Please, tell me the name of the school, the teacher, and the address. Is it the Taiwanese or the Yong Chun from the Mainland? I guess you are in the UK. There is great White Crane out there. I study Yong Chun White Crane in the US and I like to know and learn about all the lineages of any of my arts.
Q:The earthing resistance of tower crane shall not be greater than that of the tower crane
The lightning resistance of tower crane (tower crane) on the construction site shall be no more than 4 ohms.I. tower crane GB/T 5031--20085.5.5.9 lightning protectionIn order to avoid lightning stroke, the main structure of the tower crane, the motor frame and all the electrical equipment metal shell, wire metal protection tube should be reliable grounding, and its grounding resistance should be no more than 4 ohms. When multiple repetitive earthing is adopted, the grounding resistance shall be no more than 10 ohms.Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:Yeah, I think I know what cranes are used for. But in the context of building an apartment and so on, what is the role derricks there. And why is called cranes and derricks - What is the correlation between them.
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q:There are 2 Sandhill cranes that come by my house often because I feed them. I noticed that one of them has its right foot bent up awkwardly. It still moves around and travels with ease, but I wonder if there is something I could about it? Who should I contact?
Did you know it is illegal to feed them? As long as the crane is able to feed and fly wildlife officials will leave it alone. You would only need to call if it is no longer able to fly. Due to turtles, fish and other aquatic critters it is common to see cranes, heron, and other waterfowl with funky feet. Its fine.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords