TC7034 Sales Construction Equipmen Building Machinery Distributor

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7034 Description:

1.CMAX Tower Crane TC7034  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7034 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7034 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7034  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7034  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7034 Parameter:

 Max. working range 70m, tip lifting weight 3.4T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 3.4


Tower Crane TC7034  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7034 Diagram:

TC7034  Sales Construction Equipmen Building Machinery Distributor

TC7034  Sales Construction Equipmen Building Machinery Distributor

Tower Crane TC7034 Technical Sheet:

TC7034  Sales Construction Equipmen Building Machinery Distributor

Tower Crane TC7034 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7034 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “34” means the tip load is :3.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is tower crane? What are the types and features?
[definitions]Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Construction tower crane operator certificate expires, how to verify?
Six, related requirementsEach enterprise shall, according to the notification requirements, arrange the personnel engaged in the work of this unit, and invite every unit to earnestly examine and clean up, and those who have not obtained the certificate will sign up for the training. The certificate into the industry qualification management, obtain the job qualification certificate, can engage in the corresponding work, and as an important basis for certification.Seven, registration requirements and locationsStarting from now on, please bring your ID card copy and one inch registration photo for you when you sign up for two. Fill in "Chongqing construction crane operator qualification table", the applicant's employer to the District Construction Committee, post training center application.Contact: He Zongfang, Hu Baofeng, zip code: 401120Tel: 67376688 Fax: 67800098E-mail:ybjsgp@163.comHttp://www.cqybjs.com (Yubei construction information network)Hereby notifyChongqing Yubei District construction post training centerFebruary 20, 2008
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:All types of jack up cranes. How is the maximum lifting torque converted?
Tower crane lifting torque = crane maximum lifting weight * maximum operating range; for example: the maximum lifting weight is 2T*, the maximum operating range of 50 meters =1000KN.m.
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:Climbing process of an internal climbing tower crane
Climbing tower crane, usually installed in the elevator shaft building or ad hoc Bay, also can be installed in the cylinder structure, by means of a climbing mechanism increases with the structure increases, generally every building 3~8m, crane climbing a tower, its height is only 20m left and right, lifting height with construction height and.
Q:How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q:What are the qualifications for site installation and acceptance of tower cranes and construction lifts?
These do not worry about you, these large machinery is a professional installation team, security, demolition,
Q:What role does the tower crane torque limiter play?
The torque limiter can play the weight overload or working radius beyond, beyond the technical performance of the tower crane at the moment, immediately cut off their own lifting or variable power source, will send the alarm signal to prevent the occurrence of accidents.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range