TC6518 Buildings Tower Crane

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. 10T/12T tower crane

2. Factory cost

3.block mast section, strengthen

4.Advanced painting process

5.ISO,CE, GOST

Our various model goodsas follows:

1.Topkittower crane (4-12 tons)-

QTZ40,QTZ50,QTZ63,QTZ80,QTZ100,QTZ125,QTZ250,QTZ315

2.Flat top/Hammer headtower crane (4-10 tons)-

QTP4810,QTP5010, QTP5210,QTP5510, QTP5515,QTP6016

3.Luffing tower crane(8-12 tons)-

QTD100,QTD125,QTD160,QTD300

4. Building Hoists(SC200/200, SC100/100, SC100, SC200) single cage or double cages. load capacityis 1 ton/cage or 2 tons/cage

5. Aerial suspendedplatform(ZLP630)

Company Information

Professional tower crane manufacturer in Supplying/Offering Brand New Self-erecting Tower Crane with new HYCMBrand. Export To More Than 20 Countries With CE/ISO Certificates.

Two manufacture factories and 5 produce lines for topkit tower crane, topless tower crane, luffing towercrane, construction hoists and aerial suspended platform.

   Our company qualitypolicy is leading in the development of science and technology, managementof standardizing, quality first, customer satisfication and struggle towardsquality goal that is no accident and zero defect.

   Our brand "HYCM"Tower Crane has got a high reputation at home and abroad due to our quality andcredit. We have after-sale offices in almost all the provinces in China.  

   Gathering allcorners of the land and making friends all over the world, the company willcooperate with the masses of knowledgeable people of all circleswholeheartedly, to connive the great cause and to create the resplendence.

Inquires QA:

My dear friends, If you need any towercranes, please tell us the below basic parameters:

1. Building height or tower crane workingheight.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements

Welcome to contact us! Believe will be your best choice!



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:National standards for tower cranes
GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
Q:Is JIB type crane better than Telescopic Cranes ?
And your question is?
Q:What are the parts of a tower crane? What are their main functions?
The structural elements include the followingMain arm: carrying weight, and making the trolley have walking track.Balance arm: put up lifting mechanism, electric box, counterweight, and make tower crane to achieve balance torque, reduce the standard section of the bending moment.Tower cap: connect the main arm with the balance arm by the tie bar, so as to reduce the bending moment of the standard section.
Q:I have some cranes in our field next door and I was wondering do they eat chickens? I live in Wisconsin.?
Ha ha ha, You have nothing to worry about!
Q:Collapsing Cranes..?
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
Q:how do they take crane off top of building?
Commonly cranes attached to the top of buildings were built up there.
Q:What kind of energy/effort is used to power a crane?
Most cranes are diesel engine powered hydraulics and hydraulic motor. So that would be fossil fuel. Some cranes use pulleys to magnify the total lifting capacity. A pulley magnifies work by exchanging distance for lifting power. For example, to lift a 10 ton weight 20 feet in the air, if you put four pulleys in there so that 80 feet of cable would have to be pulled up , then it would only take 1/4 the amount of power to lift that 10 tons (2.5 ton lifting force would lift it) Look at any links or wikipedia for how compound pulleys work.
Q:Any ideas as to how I can gift 1000 cranes + messages?
3 Aw that is so sweet, maybe you can make a mobile or tie them all on a string. i also really like the scrapbook idea, maybe u can make the cranes small so that they all fit in the scrapbook.
Q:How do they put up tower cranes?
Really simple to put up BUT you must double check all your pins and triple check yourself as you go up with the tower crane I have helped put over 24 tower cranes. Only have experienced men do this and always check every step as you go up.
Q:A heavy concrete panel is being lifted into position in a building by means of a crane (see figure below). The?
The crane contributes a torque of 495,979.8 Newton-meters. 1.78e+4 * 46.3 * cos(53.0) = 495,979.8 ...but this is not the total (net) torque. There is also a torque due to the weight of the concrete slab - torque we are ignoring since we do not know the weight of the slab.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range