TC6016 tower crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6016 tower crane tower crane is novel hoisting and conveying machinery which is designed by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the maximum working amplitude of 56m, the independent lifting height of 40m, the adhesion lifting height of 150m, the rated lifting moment of 710kN•m and the maximum lifting moment of 853.2kN•m. All the performance parameters and technical indexes of the crane meet or surpass national standards.
The crane features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many construction enterprises.

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

 

Amplitude(m)

3-13.6

14

15

16

17

18

19

20

21

22

23

Lifting capacity(kg)

4000

3890

3618

3380

3170

2860

2810

2660

2530

2400

2290

Amplitude(m)

24

25

26

27

28

29

30

31

32

33

34

Lifting capacity(kg)

2190

2090

2000

1920

1850

1770

1710

1650

1590

1540

1490

Amplitude(m)

35

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1440

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-26

27

28

29

30

31

32

33

34

35

Lifting capacity(kg)

2000

1920

1850

1770

1710

1650

1590

1540

1490

1440

Amplitude(m)

36

37

38

39

40

41

42

43

44

45

Lifting capacity(kg)

1390

1350

1310

1270

1230

1200

1170

1130

1100

1070

Amplitude(m)

46

47

48

Lifting capacity(kg)

1050

1020

1000

 

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

500

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~48

Maximum amplitude lifting capacity

t

1.0

Lifting height

Independent

m

30

Attached

m

120

Time of moving outrigger end to rotation center

m

48.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

7

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:Wall mounted tower crane
The construction of tower crane installation, operation and dismantling safety technical regulations "(JGJ196-2010) design provisions in article 3.3 attachment device of tower crane: when the tower crane attachment for use, attachment device settings and free height should comply with the provisions of the instructions; when the attachment level distance, attachment spacing does not meet the the instructions to.
Q:What is the allowable range of vertical deviation for tower cranes?
Previous answers to this question have been made. In the industry standard "construction site inspection of machinery and equipment technical specification" (JGJ160-2008), in the form of mandatory provisions: the tower crane installation height to basic design requirements, the axis of the tower line should be no more than 0.4% of the bearing surfaces of the lateral vertical deviation; after the attachment, the highest attachment point following the vertical deviation should be less than 0.2%. "The basic height of the design requirements" in the "strong regulation", that is, the maximum independent installation height on the site".
Q:What are the special operators of tower cranes?
Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q:How many meters of cranes should be in accordance with the anemometer?
In accordance with national regulations, outdoor cranes need to install anemometer.Specific provisions"GB6067.1-2010 crane safety regulations", 9.6.1 anemometer and wind speed alarm9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be located upwind of the upper part of the crane.9.6.1.2 high speed crane for outdoor operation should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:Equipment safety of tower crane
The boom of a tower crane is divided into two types: horizontal and compressed arms. When the movable arm is horizontal, the carrier car runs along the horizontal arm with variable amplitude and amplitude, and the movable arm is longer, but the boom has a larger deadweight. The arm for the strut type when the tractor boom luffing mechanism pitch amplitude, amplitude motion than horizontal smooth, but its relatively small weight.The weight of a tower crane varies with its amplitude. The product of the weight and the amplitude is called the load torque, which is the main technical parameter of the crane. Through the rotary mechanism and slewing tower crane, lifting height, rotation and walking the inertial mass, so it needs to have good control performance, especially the lifting mechanism can fast, slow, heavy and light load installation fretting. In addition to the general use of resistance speed regulation, but also often use eddy current brake, FM, pole change, SCR and mechanical and electrical joint speed regulation. When the crane in the layout to drawing, especially in real estate development area, residential buildings, such as tower crane, but also to consider the safety distance of adjacent tower crane, two in horizontal and vertical direction to ensure the safe distance of not less than 2m, the adjacent tower crane tower crane and interference can not occur. Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:What windproof devices should be set up for crane work?
Safety protection device and function of crane1. overload limiterIt is a safety guard for cranes to prevent overload, also called a weight limiter. The safety function of the utility model is that when the crane load exceeds the rated value, the lifting action is stopped, so as to avoid overloading. Overload limiters are widely used in bridge type cranes and elevators. Some boom type cranes (such as tower cranes and gantry cranes) use the overload limiter and the torque limiter together. Overload limiter has mechanical, electronic and many types.(1): mechanical drive ram through a lever and a spring cam, etc., when overloaded, hit the switch control rod and the lifting action phase, cut off the power source of hoisting mechanism, control the lifting mechanism to suspend operations.(2) electronic: composed of a sensor, an operational amplifier, to control the actuator and load indicator, display, control and alarm and other security functions in a body. When the crane is loaded, the sensor on the load bearing component is deformed, and the load weight is converted into an electric signal, and the value of the load is indicated by operation amplification. When the load exceeds the rated load, the power source of the lifting mechanism is cut off so that the lifting action of the lifting mechanism can not be realized.
Q:Can the tower crane personnel install the construction elevator?
As for the hoisting equipment, the licensed crane erection worker can install the construction elevator.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:What is the difference between a tower crane and a jack up tower crane?
The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range