TC6014 tower crane with CE ISO certificate

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6014 tower crane with CE ISO certificate

TC6014 tower crane with CE ISO certificate


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:where can i read defiance by shelly crane online?
did you ever get to read this book
Q:Reason why some contruction cranes/wrecking ball cranes use tires.?
Shock absorption. The ball swings toward the building and hits, the energy of that swing is mostly dissipated into the building but also into the cable and cable connectors as the ball bounces back. That shock of the impact resonates and gets dissipated by the tire. It reduces wear and tear on the cable and cable connectors, also on the crane tower. Your car engine has motor mounts of the rubber type of material and it absorbs the resonating vibration of the engine. I have seen the cable connectors, interesting to say the least. The strands are interlaced sometime, and other times I see them clamped together. It would seem important to protect those joints. I do not know all of the crane business terminology, but that would be the gist of it.
Q:Overlord 2: need help getting blue minions with crane thing.?
Found the answer!:) By that point, if you did everything right you should have 8 blue minions. Put 6 of them on the crane and 2 of them(with a guard marker) in the middle where you ar gonna drop the ones from above. Then when you drop them, the ones guarding will pick them up and heal them.:) P.S.A tip, if you want the crane to come back slower don't remove all the minions from it, just remove 2 and the rest will slow it down. Hope this helped, have fun.:)
Q:Are sandhill cranes edible?
yeah, but they are a little tough and taste sort of like Mexican Spotted Owl
Q:How do tower cranes stay balanced when they have very long booms and very heavy loads moved inward and out?
I think the counter weights are connected to a pully system that directly interacts with the boom and hook movement. This way it can put more or less pull on the weights according to the amount of weight or position of the weight on the crane.
Q:How should we select a appropriate crane for a particular job ?
What is the load weight? How high is the lift? Obstruction, possibly needing a jib? If you are placing a load onto a roof, how far from the edge of the roof is the load going to be placed? How far from the crane pivot is the load on the ground and how far are you going to to move the load away from the crane to place it in position? How close can you get the crane to the load and to the load placement site. The usual scenario is to call a crane outfit and they will ask you these questions over the phone or come to the site and discuss the lift with you. A crane is rated for maximum lift as close, usually 10 feet,to the cab pivot center. As the distance increases, the maximum load that can be lifted, decreases. Our 15 ton crane can pick 15 tons/ 30,000 pounds at 10 feet from pivot center. With the boom fully extended; the boom is 100 feet, at a 30 degree angle, it can pick up only 5,000 pounds. Inside of every crane cab should be a chart that shows the lift capacity at various boom angles and boom lengths. Also is included is a chart for the Jib, if the crane has one. Wingman
Q:What should be included in the disassembly plan of the tower crane?
- 1 -Contents and requirements of special construction plan for tower crane installation1. General situation of Engineering; 2, installation location and elevation plane3. The type, performance and technical parameters of the tower crane selected4,; foundation and attachment device set(1)The foundation of tower crane and the bearing capacity of its foundation shall comply with the product specificationRequirements for books and design drawings. Before installation, the foundation shall be checked and accepted before installation. There should be drainage facilities around the foundation.(2)Attached tower crane is used, the attachment device and set freeThe end height shall comply with the requirements of the product manual. When adhering to a horizontal distance or attachmentThe design calculation and drawing system should be carried out when the spacing is not satisfied with the requirements of the product specificationDrawing and writing relevant instructions shall be examined and approved by the technical leaders of the enterprise or through the originalManufacturer confirmation. Attachment device and component shall be the original manufacturer or by embedded partsEnterprise with corresponding ability to make. Attachment device design, the main structure of the building to support the checking.5, climbing conditions and adhesion node detail;The foundation, anchor and climbing support structure of an internal climbing tower crane shall be used as the foundationAccording to the product manual to provide the design calculation, and the internal climbing tower crane bearing structure checking.6, the main components of the weight lifting and installation position.7, the installation of auxiliary equipment; the type, performance and arrangement position.8. Rigging and special tools9, set the power supply;10, the construction personnel configuration;
Q:What is the calibration value of a tower crane?
Do you mean the calibration value of crane lifting moment? That should be the product of the maximum magnitude of the tower crane and the corresponding maximum lifting load.
Q:which is crane lift planning software free to download?
autocad based
Q:Whooping Crane or Whopping Crane?
Whooping crane, largest bird in North America, named so for its call.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range