TC6014 tower crane with CE ISO certificate

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6014 tower crane with CE ISO certificate

TC6014 tower crane with CE ISO certificate


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the special operators of tower cranes?
Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q:What is the difference between a jack up tower crane and a fixed tower crane?
The jack up tower crane is a tower crane (that is an internal climbing tower crane) that is added and reduced by its own special device, namely, the standard section of the tower (that is, the attached tower crane) or the whole climbing tower itself.
Q:What are the luffing, slewing, and walking points of a tower crane?
The luffing of a tower crane is the forearm of a crane;Slewing means the steering mechanism of a crane;Walking means the walking trolley on the luffing range of a crane
Q:What is the difference between crawler crane and tower crane?
Tower cranes are generally used in high-rise building construction. They are self elevating and attached. The boom is very long and the construction site is very common. Multi story buildings can be replaced by automobile cranes.Crawler cranes are used in municipal engineering, such as subways, bridges and so on. Lifting weights can be moved.It's very easy to tell from the outside, so you can search for some pictures.
Q:When the tower crane is installed in the fertilizer tank,
There is no standard in the tower crane foundation and building foundation, there is no such provisions.In fact, you can do whatever you can. The only factor that can be said is the Design Institute, to see if they agree.Design Institute to consider this problem, generally disagree, you let the two based on the surface flat, because there is a stress concentration problems. It's like a pebble under your mattress. So, in general they will demand based on the surface in the construction of tower crane foundation floor, the middle 30-50cm gap with soil pad.Of course, no matter which of these two methods you have to use the back belt to enclose the tower crane foundation.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:How many tons are tower cranes QTZ125?
Nominal lifting torque KN • m 1250Rated lifting torque KN • m 1300Maximum lifting weight T 8Operating range M 3~60Maximum rated lifting weight t 1.5Maximum lifting speed m/min 80The lowest steady decline speed of m/min is less than or equal to 7Lifting performance two rate lifting speed m/min 80405.6Lifting weight t 248Four magnification lifting speed m/min 40202.8Lifting weight t 488Variable speed m/min 52/26/8Slew speed r/min 0.63Lifting height independent type M 50Attached m 170Design weight t 42.7 (stand height)Counterweight t 21.2The working environment temperature is Co -20 to +40Maximum working wind speed is m/s 20The maximum wind speed at ceiling is m/s 13
Q:Tower crane 10-5-20 is 6T, and 10-5-21 is 8T. What do you mean by tons?
6T/8T refers to the maximum lifting capacity of a tower crane. It doesn't matter what 10-5-20 has to do with it. Maybe your list of numbers is serial number.
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:What is the scrap standard of tower crane hook?
The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range