TC6010 With Jib 60M and 1.0Ton Tip Load Hammer Head

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6010 Description

 

Feature: Tower Crane                       

Condition: New

Rated Loading Capacity: 8T                        

Rated Lifting Moment: 800KN.M

Max. Lifting Load: 8T                         

Max. Lifting Height: 150M

Span: 3-60M                                      

Model Number: TC6010

Certification: ISO,CE                          

Warranty: 12 Month

After-sales Service Provided: Overseas third-party support available

TC6010 Features

free height: 50m             

max.height: 150m

tower head height: 8m   

jib length: 60m

tip load: 1.0t                  

max.load: 8t

power supply: 380V/50Hz or according to clients need

Mast section:.2X2X3M

TC6010 Specification

TC6010 With Jib 60M and 1.0Ton Tip Load  Hammer Head

TC6010 Pictures

TC6010 With Jib 60M and 1.0Ton Tip Load  Hammer Head

 

TC6010 With Jib 60M and 1.0Ton Tip Load  Hammer Head

 

TC6010 FAQ

1.Provide timely delivery, standby engineers are ready to solve any of your problem

2.Provide ample spare parts and training of operation and maintenances

3.Engineers have more than 10 years' experience in tower cranes and ready to slove all your problems.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Tire repairing machine for engineering machinery
Direction: tire tread on the running of the drain slip is particularly critical, so the cross-country car tire commonly used arrow pattern of asymmetric sign assembly to ensure that the design of the rolling direction, adhesion, and antiskid performance. If you pretend to be wrong, it is counterproductive
Q:What are the core technologies involved in the core components of construction machinery?
First of all, the use of conditions, technical parameters, after the design drawings, materials selection, casting, and other, and then conduct a formal test, determine the work parameters, etc., the problem is too large, not too good to say. Specific point just fine.
Q:What are the listed companies of construction machinery in China? What are the shares of A?
Listed companies report you can log on the Shanghai stock exchange and Shenzhen stock exchange website, in the information disclosure of periodic reports below can be found in the name and code, the construction machinery companies in the picture below.
Q:What about mechanical and electrical engineering? Employment direction? Employment prospects?
Graduates can go to all kinds of machinery design and manufacturing enterprises, electronic and electrical enterprises and other production departments, companies, like you, confused, looking forward to the answer, I also learn this, which school you have, employment is very wide,
Q:What about the marketing department of mechanical engineering students?
Mainly to do some market development work! And sales are different, marketing department general workload is very small, every day nothing, work is not tired!
Q:Do you have a promising future in the foreign trade of machinery industry?
Most of the technical principle of mechanical products is very complex, it is generally difficult to fully understand the structure and use of technology and methods, but foreigners are very dedicated, generally involving imports of machinery products are the basic personnel and technical personnel, so when they discuss the transaction, can only put forward a lot of professional and technical personnel to be able to reply the complex problem, our domestic general foreign trade staff did not reply and exchange.
Q:What are the total cost of the project?
Indirect costs (including fees and charges. Engineering engineering scale of fees. The social security fee. The housing provident fund. The dangerous work accident insurance) and enterprise management fees (management personnel wages. Office expenses. Travel and transportation fees. Fixed asset use fee. Instrument use fee labor insurance premium. The employee education expenses. Union funds. Property insurance. Financial expenses. Other taxes.)
Q:What does the construction machinery include?
Earthmoving machinery such as bulldozers (can be divided into wheel bulldozer bulldozer and scraper (), can be divided into crawler scraper, tire scraper and towed scraper loader (), can be divided into wheel loaders and crawler loaders and graders (can be divided is a self-propelled grader and towed grader), transport vehicle (also can be divided into single shaft and double vehicle traction transport vehicle), flat car and truck etc..
Q:What are the five major cost components of the project cost?
The cost of the project is divided into two parts: direct and indirect. The direct cost consists of labor, material, mechanical and other direct costs. Their composition is as follows: labor cost refers to the budget quota, engaged in construction personnel wages, bonuses, wages, surcharges, and wages of the Jin, labor protection fees.
Q:I want to sign up for a construction machinery rental company! What should I do? Steps? How much do you charge for a year?
Registered company each link required statutory time limit: check the normal circumstances within 2 working days to inform the result; account injection of bank procedures according to the provisions of the bank, usually in the 3 working days; verification under normal circumstances within 7 working days of the business license of the statutory time limit for 3 working days of audit group, tax registration certificate the statutory time limit for 30 working days to complete the registration fee: 1500 yuan single registration

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range