TC5613 Hammerhead Tower Crane with CE and ISO9001 Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Descriptions of our TC5613 Hammerhead Tower Crane with CE and ISO9001 Certificate
1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6, The steel structure of crane boom has long using life and high safety standard.
7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Tower Crane TC5613 Parameter:
Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.
Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
Trolleying mechanism can provide two operation speeds.
Free standing height (m) 46
Max height with attachment (m) 150(200)
Working range can be adjusted (m) 44,50,56
Min working range (m) 2.5
Max lifting capacity (t) 8
Tip load @ 50m (t) 1.3
Features of our TC5613 Hammerhead Tower Crane with CE and ISO9001 Certificate
Item | Parameter | ||||
Free standing height (m) | 46 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 44/50/55 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 56m(t) | 1.3 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | YZTDE132L-4 /8/16 3.3/2.2/1.1KW | ||||
Slewing mechanism | Speed(r/min) | 0-0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 14.1 | ||||
Mast section size(L×W×H)mm | 1800×1800×2500 | ||||
Working temperature | -40-+60°C | ||||
Max working wind(m/s) | 20 | ||||
Total power(KW) | 42 | ||||
Rated working voltage & current | 380V/128A | ||||
FAQ TC5613 Hammerhead Tower Crane with CE and ISO9001 Certificate
1. why chose us?
China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various
kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.
2.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
3. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
4.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
- Q:Who was the guy called the Headless Horseman in the story of Ichabod Crane?
- Legend of Sleepy Hollow--The legend was that the headless horseman was the ghost of a Hessian soldier but the reality is that it's no doubt Van Brunt dressed up as the legendary horseman to scare Crane and make a fool of him so he is no longer in competition with Van Brunt for winning the hand of Katrina van Tassel.
- Q:On the show Passions was Fox Crane ever sexually assaulted?
- he and several other male characters have been sexually assaulted. Oddly enough, men on the show are equally as likely to be violated as women. Fox Crane, Julian Crane, Luis Lopez-Fitzgerald, Miguel Lopez-Fitzgerald, and Ethan Winthrop have all been victims of sexual assault. His individual character bio doesn't describe about it though.
- Q:Grade 4 build a working crane Help!?
- I would use about a 2 foot piece of broomstick pinned through a hole in one end. Maybe 2 to 3 inches away, a larger clearance hole with a 1/4-20 nut glued under. Use a lo-o-ong 1/4-20 bolt as a driver. (1/4-20 is 1/4 inch diameter with 20 threads per inch.) I leave the mounts and string up to you as to encourage your participation and creativity.
- Q:how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q:the lifting capacity of a hydraulic crane is based on two primary design factors what are they?
- The potential lifting force of a hydraulic crane is primarily based on the diameter of the piston and on the pressure of the oil. Everything else is subservient, but necessary.
- Q:Is it to do with visibility?What are some other colours of cranes?
- Visibility. In the U.S. most that I have dealt with have been schoolbus yellow or international orange. Cranes represent a hazard not only from the fact that the crane operator has restricted visibility and has to concentrate on the load and the signals he is receiving from the rigger but the load itself constitutes a hazard.
- Q:There is no CAD map attached to embedded parts of tower crane?
- What size do you want?. Each model is different. For example, the 5010 tower bolt embedded needs 24.
- Q:what is the common cause of crane accidents
- i might think of that for the time of many situations the fault is with wrong maintenance, and inspection. the government has quietly comfortable well being and protection rules on the behest of their company acquaintances, and as common the worker will pay the value.
- Q:i'm doing it for fun but i was wondering because my aunt had a baby that like 1 and the baby has cancer and i'm gonna try this to help her please don't be mean like the only thing you will get is sore hands and stuff is it true or is it a myth only answer if you did thid and i want to know what happened to you but anyway ill pray to god that everything will be ok with the baby
- I wish that were so but God only acts according to HIS will. Not your will but thy will be done, it doesn't hurt to ask and hope that he will grant you with what you desire but don't be disappointed when it doesn't happen. And remember, just because it does not happen doesn't mean that he didn't listen. We do not know what God has in store for us until it happens, but that's what we call faith. Trust in HIM and you shall receive, even though it might not be what you want God is righteous and you may expect a better outcome than what you have expected.
- Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
- The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TC5613 Hammerhead Tower Crane with CE and ISO9001 Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 100 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords