TC5510B tower crane

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

·   Customer can tell Masan the detailed specifications and Masan can make the suitable products for customers.

·   Manufacturing Year: 2014

·    Jib Length: 55m

·   Free Height Under Hook: 40m

·  Max. Load: 6T

·  Tip load: 1T

·  Mast Section Dimension(m): 1.6x1.6x3 (L44)

·   Hoisting Speed(m/min) & power: 8.5/40/80 24Kw

·   Slewing Speed (r/min) & power: 0~0.8 5.5Kw frequency

·  Trolleying Speed (m/min) & power: 43.7/21.7 3.3/2.2kw

·   Cable specification: 3x162 +2x102

·   Power Supply: 400V(+6% -10%)50HZ

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the climbing claws on the tower crane?
Climbing is lifting work cylinder claw pole on the standard main limb rod bearing points of the.
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:What should the sub contractor do before the installation of the bridge crane in the workshop?
Baidu search [tower crane tower demolition, lowering section safety technical disclosure]. If it is installed, remove the "two words" to "installation", and other contents are adjusted slightly.
Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:What is a tower crane without a collector?
Without the collector, the main cable of the tower crane directly reaches the power distribution cabinet after turning.
Q:What is the safe distance of a tower crane to the surrounding buildings?
JGJ160-2008 "construction site mechanical equipment inspection technical regulations" on the 46 page clearly written, safety distance shall not be less than 0.6 meters,
Q:Equipment safety of tower crane
Safe distance tower and transmission line is not up to the requirements of the tower frame door frame to design, erection principle to power erection, do not use metal materials, bamboo and other materials can be used. The distance between a bamboo pole and a power line shall not be less than 1m, and a certain degree of stability shall be taken to prevent the wind from blowing. The tower crane height and bottom bearing size ratio is large, and the center of gravity of the tower body, high torque, braking frequency, impact force, in order to increase its stability, we will analysis the main causes of the tilting of the tower crane has the following:Overloading. Different types of cranes usually adopts the lifting torque based control, when the amplitude exceeds the rated load weight increase or the corresponding weights, the overturning moment more than stable moment of it, it may cause the collapse of the tower crane.Two, inclined hanging. Slant weights will increase its overturning moment, the lifting point will produce horizontal force and vertical force on the crane, bottom supporting point will produce an additional overturning moment, and the stability coefficient is reduced, resulting in tower crane collapse.Three, the tower crane foundation is uneven, the ground endurance is insufficient, the perpendicularity error is too big, also can cause the tower crane to overturn the moment to increase, causes the tower crane stability to reduce. Therefore, we should proceed from these key factors to strictly check, check and check, and prevent major equipment personal safety accidents. State explicitly eliminated the model should resolutely prohibit the use of, in disrepair, tower crane in the identification of the repair, to limit the use of load, tower crane for the use of fixed number of years there is no uniform standards, opinions vary, different places have different provisions.
Q:Can the attached arm of the tower crane be welded?
The calculation of the attachment of tower crane mainly includes three parts: attachment rod calculation, connection calculation of attached bearing and calculation of attached frame. (1) the attachment bar calculates the attachment bar and is calculated by the compression member of the pivot shaft hinged at both ends. 1) the internal forces of the attached rod and the internal force of the connecting rod are taken as required by the instruction; if the specification does not specify, or when the spacing between the two supports connected with the building is changed, the calculation shall be carried out.
Q:Tower crane technical condition GB/T 9462-1999 has been cancelled? If so, what is the new standard?
the requirement for selecting the steel quality group based on the results of brittle fracture evaluation of steel is increased;Environmental requirements and nondestructive testing requirements for welds are increased;- increased the number of institutional requirements;- increased the type and requirements of some of the units;- - increased technical data requirements that manufacturers should provide;- added some information labeling requirements;- mounting and climbing requirements are increased;The inspection requirements of tower crane are described in detail.
Q:Under what circumstances does a tower crane require third party testing?
New installation, demolition, close, major transformation, the use of site work committee, the use of factories to the Technical Supervision Bureau

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range