TC5020/5515 With Jib 50M and 2.0Ton Tip Load Hammer Head

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
20 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC5020 Description

  • Feature: Tower Crane                       

  • Condition: New

  • Rated Loading Capacity: 8T                        

  • Rated Lifting Moment: 800KN.M

  • Max. Lifting Load: 8T                         

  • Max. Lifting Height: 150M

  • Span: 3-55M                                      

  • Model Number: TC5020

  • Certification: ISO,CE                          

  • Warranty: 12 Month

  • After-sales Service Provided: Overseas third-party support available

TC5020  Features

  • free height: 45m            

  • max.height: 150m

  • tower head height: 8m   jib length: 55m

  • tip load: 2.0t                  

  • max.load: 8t

  • power capacity: 46.2kw

  • power supply: 380V/50Hz or according to clients need

  • Mast section:1.6x1.6x3m

TC5020 Specifications

TC5020/5515 With Jib 50M and 2.0Ton Tip Load  Hammer Head

TC5020  Pictures

 

TC5020/5515 With Jib 50M and 2.0Ton Tip Load  Hammer Head

TC5020/5515 With Jib 50M and 2.0Ton Tip Load  Hammer Head

TC5020/5515 With Jib 50M and 2.0Ton Tip Load  Hammer Head

 

 

TC5020 FAQ

Q: What is the brand for tower crane motor?

A: All the selected motors are outsourced from the same company as PotainChina, which passed CE inspection (if you need, we could provide related certificate)

 

Q: What is the brand for tower crane converter?

A: Normally, more than 10t series tower crane is equipped with converter. The selected converter includes SCHNEIDER, SIMENS, YASKAWA…it could be selected as per clients’ request.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the listed companies of construction machinery in China? What are the shares of A?
You download a Sina access, there are engineering machinery section, all stocks can be found. Very convenient。 Please take it if you have any help. Thank you
Q:What about mechanical engineering at North Point? Graduate, good job?
Engineering machinery application technology is divided into eleven chapters, the domestic and foreign engineering machinery and the use of mechanical engineering technology is summarized, introduces the construction machinery used in the process of technical condition change, engineering machinery technology status detection and diagnosis, engineering machinery maintenance techniques, the use of diesel technology, engineering machinery, engineering machinery, rational use oil application technology, engineering mechanical transmission and hydraulic system using the technology, the use of technology, earthmoving machinery and compaction of asphalt pavement construction machinery by leading technology.
Q:What kind of car engineering does that belong to? Is it traffic or machinery?
Neither, but they are related. The professional training to master the basic technology of machinery, electronics and computer engineering comprehensive theory and necessary professional knowledge and skills, understand and pay attention to the development of automotive technology and related social knowledge, in enterprises and scientific research institutes (schools) and other departments, engaged in related vehicle engineering product design and development, manufacturing, testing, application study on the technology, service, sales, management and other aspects of the work of senior specialized talents with strong practical ability and innovative spirit.
Q:The 3 partners purchased the construction machinery, and one of them died during the construction. Will the other two compensate for it?
First of all, to confirm that, ABC joint venture to buy a crane in the use of A crane operation, ABC whether the common return benefits, and if BC has received the return of interest, then BC need to assume corresponding responsibility. If you are in the Guangdong area, you can contact me, phone user name.
Q:Do you have a promising future in the foreign trade of machinery industry?
Mechanical trade is very difficult to do, is the first mechanical product varieties and specifications is very complex, followed by the initial negotiation cycle of most large mechanical products is very long, so need comprehensive quality of participants is too high, it is generally difficult to do, or even into the machinery industry quickly back out.
Q:Material costs, machinery costs, management costs, labor costs accounted for the proportion of construction projects
5, travel expenses, property insurance, 6, 7, 8, engineering maintenance fees, sewage charges, 9, labor protection fees, inspection fees, 10 test, 11, outside the unit management fee, 12, finishing materials and sporadic freight, 13, material shortage and damage
Q:What exactly does machinery sale do?
There are many kinds. Such as construction machinery sales, chemical machinery sales, construction machinery sales, etc.. Products are not the same, the content of the sale will not be the same
Q:Other Xuzhou Construction Machellonery Group Inc related
XCMG has increased its investment in technology, management, manufacturing and internationalization, with bright spots and rising levels. A total investment of 5 billion yuan Xu large tonnage crane industry base foundation, will build a world-class industrial base for producing adult more than ten thousand cranes; a total investment of 730 million yuan with international level Jiangsu Xuzhou Research Institute of construction machinery construction project foundation; joint venture XCMG Doosan engine enterprises completed and put into production.
Q:Bachelor degree in mechanical engineering. How about Liu Gong in Guangxi?
Five social insurance and one housing fund, in general, is not high, but also according to the level of pay, if you are just in general is assistant, and Liugong no accommodation (bidding agency), and the school recruit live a month, other subsidies to 250 fast, quite low, now the construction machinery industry downturn downturn, treatment is not good.
Q:What are the five major cost components of the project cost?
Material cost means the amortization of the raw material, structural parts and semi-finished products, auxiliary materials, and turnover materials and the rental costs of the raw materials, components, fittings and semi-finished products, auxiliary materials, which are included in the budget. Mechanical use fees refer to the contents of the quota included in the budget, the mechanical use fees incurred in the construction process and the rental fees of the construction machinery leased by the outside units, and the fees for installation, disassembly and entry and exit

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range