• TC5013B 6T New Product Alibaba China Tower Crane Price System 1
  • TC5013B 6T New Product Alibaba China Tower Crane Price System 2
  • TC5013B 6T New Product Alibaba China Tower Crane Price System 3
  • TC5013B 6T New Product Alibaba China Tower Crane Price System 4
  • TC5013B 6T New Product Alibaba China Tower Crane Price System 5
  • TC5013B 6T New Product Alibaba China Tower Crane Price System 6
TC5013B 6T New Product Alibaba China Tower Crane Price

TC5013B 6T New Product Alibaba China Tower Crane Price

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Descriptions of our TC5013B 6T New Product Alibaba China Tower Crane Price


1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our TC5013B 6T New Product Alibaba China Tower Crane Price


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.


Features of our TC5013B 6T New Product Alibaba China Tower Crane Price

Independent height (m)

41.5

Max height with attachment (m)

141.5

Working range can be adjusted(m) 

44/50

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.5

-

3

3

-

6

Speed(m/min)

0

-

80

0

-

40

Motor

YZRDWF225M-4/8-24/24KW     

Trolleying mechanism

Speed(m/min)

12/27/53

Motor

YZTDE132L-4 /8/16-3.3/2.2/1.1KW  

Slewing mechanism

Speed(r/min)

0-0.6

Motor

YZR132M2-6-3.7KW X2

Climbing speed(m/min)

0.58

Counterweight(t)

13.05

Mast section size(L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

37

Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   108A

 

TC5013B 6T New Product Alibaba China Tower Crane PriceTC5013B 6T New Product Alibaba China Tower Crane PriceTC5013B 6T New Product Alibaba China Tower Crane PriceTC5013B 6T New Product Alibaba China Tower Crane PriceTC5013B 6T New Product Alibaba China Tower Crane Price


TC5013B 6T New Product Alibaba China Tower Crane Price

FAQ TC5013B 6T New Product Alibaba China Tower Crane Price

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Q:What tower cranes are used on the 30 storey house?
According to the weight and the lifting range in order to determine the size of the tower crane tower crane lifting moment! Size to measure the lifting torque maximum weight * maximum weight of the amplitude of.QTZ63 represents 63 tons - meters, general building does not involve carrying heavy, almost 63!
Q:I read Maggie: A Girl of the Streets in eleventh grade and I wonder if the author, Stephen Crane, was the same Stephen Crane that married Lana Turner.
Not according to the iMDB. Here's some other trivia about him: Date of Birth 7 February 1916, Crawfordsville, Indiana, USA Date of Death 6 February 1985, Pauma Valley, California, USA. (anemia) Birth Name Joseph Steven Crane III Spouse Leslie Deeb (1969 - 1978) (divorced) Martine Carol (1948 - 1953) (divorced) Lana Turner (14 March 1943 - 21 August 1944) (divorced) 1 child Lana Turner (17 July 1942 - 4 February 1943) (annulled) Carol Ann Kurtz (31 December 1937 - January 1943) (divorced) Leslie Deeb (? - ?) Helen Demaree (? - ?) (divorced) Helen DeMaree (? - 8 April 1962) (divorced) Trivia Owned a restaurant in Beverly Hills. Became a father to Cheryl Christine Crane on 25 July 1943 by actress wife Lana Turner.
Q:Tower crane (tower crane)
In the form of the structure for the tower type, flat type and movable arm type. The model can be divided into QTZ63 suspension, QTZ80 crane, QTZ125 crane, QTZ crane, 315 crane and so on according to the moment division. Now used to arm length + tip weight of the way named, for example, 5513, that is, the longest length of 55 meters arm, the tip of the largest weight of 1.3 tons.
Q:Like the tall cranes on construction sites. I mean, suddenly they're just magically there!
Not in urban areas. Most cranes are put up overnight to avoid disturbing traffic and so forth. I work for a shipping company. They do put up huge cranes overnight and it is quite amazing to see, once or twice. The magic is how well it's organised. And how Santa comes along to give his blessings.
Q:I have this assignment to find out how a climbing crane is able to move up the building as construction continues.
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:This is for a school project, we need a crane with yydraulics to pick up things for science.. Any ideas ?!
try okorder /
Q:how to make a magnetic crane on cheap price?
The whole crane or just the lifting device? Not easy to be cheap in either case - the crane because of safety concerns and the lifting head because it requires a lot of now high priced copper wire, well insulated, and a hefty electrical source with long cables to get the power to the head. Best (probably) to buy used if you want to save money.
Q:Does anyone know how to make an origami crane ring out of a single dollar bill? I know it's possible, because I've seen a picture.
Money Origami Crane
Q:in the red badge of courage explain the mechanical metaphor crane uses to describe war?
These okorder /
Q:how do they make those tall cranes so TALL?
with a taller crane. Some are over 600 feet tall.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords