Product Description:

QTZ63C(TC5009A) tower crane is a fixed, self-erecting and wall-attached tower crane. In addition to its advanced parameters, reliable performance, well-looking appearance, and excellent quality, it has characteristics such as long boom, larger working coverage, hydraulic rising, and tandem mounted tower body. Its design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels. Its lifting height is obviously increased thanks to its self-erecting and wall attached function. It is applicable for construction of different industrial, commercial, office, and civil building lower than 160m, and thus becomes an ideal service-building machine at home.


 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:What is the difference between a jack up tower crane and a fixed tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.
Q:What is the insulation resistance of tower crane?
Two. Safety regulations for tower cranes GB 5144 - 20068.1.3 tower crane metal structure, track, all electrical equipment metal shell, metal line pipe, safety lighting transformer, low voltage side should be reliable grounding, grounding resistance is not more than 4 ohms. Repeated earthing resistance is not greater than l0. The selection and installation of the earthing device shall comply with the relevant requirements of the electrical safety.The insulation resistance of the 8.1.7 main circuit and control circuit shall not be less than 0.5M ohm.
Q:What are the luffing, slewing, and walking points of a tower crane?
The luffing of a tower crane is the forearm of a crane;Slewing means the steering mechanism of a crane;Walking means the walking trolley on the luffing range of a crane
Q:Tower crane body standard section connection bolt screw upward or downward, why?.
Usually it is worn from top to bottom, so that the nut is loose and the bolt will not fall directly
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:About tower crane torque limiter with 4 limit switches, each play a role, thank you
The maximum amplitude control: when the weight exceeds or prohibit increase load rate of more than 105% or greater than the maximum amplitude (amplitude limit) output control, allowing the car to be near range by car distance to increase amplitude is prohibited.Minimum range control: when the amplitude is less than the minimum amplitude (amplitude lower limit), the output control allows the car to move to a distant range, i.e., to increase

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range