TC5008 tower crnae

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. 4T tower crane

2. Factory cost

3.block mast section, strengthen

4.Advanced painting process

5.ISO,CE, GOST

Our various model goodsas follows:

1.Topkittower crane (4-12 tons)-

QTZ40,QTZ50,QTZ63,QTZ80,QTZ100,QTZ125,QTZ250,QTZ315

2.Flat top/Hammer headtower crane (4-10 tons)-

QTP4810,QTP5010, QTP5210,QTP5510, QTP5515,QTP6016

3.Luffing tower crane(8-12 tons)-

QTD100,QTD125,QTD160,QTD300

4. Building Hoists(SC200/200, SC100/100, SC100, SC200) single cage or double cages. load capacityis 1 ton/cage or 2 tons/cage

5. Aerial suspendedplatform(ZLP630)

Company Information

Professional tower crane manufacturer in Supplying/Offering Brand New Self-erecting Tower Crane with new HYCMBrand. Export To More Than 20 Countries With CE/ISO Certificates.

Two manufacture factories and 5 produce lines for topkit tower crane, topless tower crane, luffing towercrane, construction hoists and aerial suspended platform.

   Our company qualitypolicy is leading in the development of science and technology, managementof standardizing, quality first, customer satisfication and struggle towardsquality goal that is no accident and zero defect.

   Our brand "HYCM"Tower Crane has got a high reputation at home and abroad due to our quality andcredit. We have after-sale offices in almost all the provinces in China.  

   Gathering allcorners of the land and making friends all over the world, the company willcooperate with the masses of knowledgeable people of all circleswholeheartedly, to connive the great cause and to create the resplendence.

Inquires QA:

My dear friends, If you need any towercranes, please tell us the below basic parameters:

1. Building height or tower crane workingheight.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements

Welcome to contact us! Believe will be your best choice!

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a tower crane without a collector?
Once again, because the collector is using carbon brush and copper ring contact, the tower crane work in the sway of the impact is too large, easy to cause carbon brush and copper ring arc between burning. Combined with this reason, today's tower cranes do not use collector. The drawback is that the tower crane can not be one-way one-way rotation. So now the use of rotary limiter, set the tower one-way rotation can only turn 540 degrees, want to turn, can only turn in the opposite direction.
Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:Tower crane and tower crane 5
Tower crane, tower crane, also known as tower craneTower crane = tower crane = tower craneThere are many ways of vertical transportation. Construction elevator hoist etc..Tower crane features: large operating space, mainly used in housing construction materials vertical and horizontal transmission and installation of building components.It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Tower cranes should stop working when the wind speed is greater than the magnitude.
Rules for safety regulation of tower crane,The installation of tower crane is strictly prohibited at grade 4 or above
Q:How to build a tower crane?
7, the boom of the horizontal installation, setup of counterweight, main hoist installation, installation sequence of these large, there are provisions in the instructions.8 、 install operating room, main cable and control cable. Installation of crane wire rope, hook, lifting the car has been in the assembly of the boom when installed.9, at this time has completed the basic installation, the later self lifting installation, the main work by the tower crane itself equipment and artificial to complete.10 tower crane from basic height to work height.Each type of tower crane has different self lifting mounting methods. In fact, in addition to carrying heavy loads, the installation of a large number of high-strength bolts is a heavy work.11, the above is the general procedure, the actual installation work in strict accordance with the installation instructions. According to historical experience, tower crane installation accidents often occur in some professional installation team.12, the old type of tower crane installation is relatively simple, but also have independent installation, and now the development of automobile crane is not a must, general use of car crane can complete all the installation.
Q:Who invented the tower crane, please?
Tower crane originated in Western europe. The first patent on tower cranes for construction was issued in 1900. In 1905, a crane with a boom was fixed in the tower.
Q:What are the climbing claws on the tower crane?
You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley
Q:In what circumstances should a tower crane be demonstrated by an expert?
Three, lifting and installation, demolition works(1) use of unconventional lifting equipment, methods, and lifting weights of a single piece in excess of 100kN and aboveHeavy lift works.
Q:How many meters does the tower crane installation height require expert proof?
The installation, disassembly and jacking of tower cranes must be carried out by experts
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:The use of 4.0.15 tower crane height of more than 30m should be equipped with obstacle lights, jib root hinge height of more than 50m should be equipped with anemometer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range