• TC4807 tower crnae System 1
  • TC4807 tower crnae System 2
  • TC4807 tower crnae System 3
  • TC4807 tower crnae System 4
  • TC4807 tower crnae System 5
  • TC4807 tower crnae System 6
TC4807 tower crnae

TC4807 tower crnae

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. 4T tower crane

2. Factory cost

3.block mast section, strengthen

4.Advanced painting process

5.ISO,CE, GOST

Our various model goodsas follows:

1.Topkittower crane (4-12 tons)-

QTZ40,QTZ50,QTZ63,QTZ80,QTZ100,QTZ125,QTZ250,QTZ315

2.Flat top/Hammer headtower crane (4-10 tons)-

QTP4810,QTP5010, QTP5210,QTP5510, QTP5515,QTP6016

3.Luffing tower crane(8-12 tons)-

QTD100,QTD125,QTD160,QTD300

4. Building Hoists(SC200/200, SC100/100, SC100, SC200) single cage or double cages. load capacityis 1 ton/cage or 2 tons/cage

5. Aerial suspendedplatform(ZLP630)

Company Information

Professional tower crane manufacturer in Supplying/Offering Brand New Self-erecting Tower Crane with new HYCMBrand. Export To More Than 20 Countries With CE/ISO Certificates.

Two manufacture factories and 5 produce lines for topkit tower crane, topless tower crane, luffing towercrane, construction hoists and aerial suspended platform.

   Our company qualitypolicy is leading in the development of science and technology, managementof standardizing, quality first, customer satisfication and struggle towardsquality goal that is no accident and zero defect.

   Our brand "HYCM"Tower Crane has got a high reputation at home and abroad due to our quality andcredit. We have after-sale offices in almost all the provinces in China.  

   Gathering allcorners of the land and making friends all over the world, the company willcooperate with the masses of knowledgeable people of all circleswholeheartedly, to connive the great cause and to create the resplendence.

Inquires QA:

My dear friends, If you need any towercranes, please tell us the below basic parameters:

1. Building height or tower crane workingheight.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements

Welcome to contact us! Believe will be your best choice

Q:I loved Dr. Crane and his sexy glasses and eyes. Plus, I just love Cillian Murphy, haha. Is his character back in the Dark Knight, I heard he was...but I was wondering if anybody could confirm it?
Yes for a short time in the beggining of the movie for like 5 minutes.
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!
Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
Beyond the maximum independent height of the tower crane design, a wall attaching rod shall be installed
Q:A crew built this huge crane to build an office building next to my house.... There is a huge flag hanging from the top of it.... Why does the construction company do this???
probably becasue they are proud of their country
Q:What category is a Crane bird?
I KNOW I KNOW! -birds-
Q:The judge that sentenced people Death or Exile looked alot like Dr. Crane in the 1995 Batman film, which is why I ask.
cillian okorder /
Q:A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
Crane was a wonderful poet and author; I have that poem written in one of my journals from long ago. I think he was pointing out that we seek answers and protection from the world outside our bodies when we shouldn't bother with that. The universe is only a backdrop in our play, and we are the ones with power.
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:how does a crane operator's knowledge of where the centroid is generally located for most uniform objects help them perform their job more safely?
Usually it is the rigger who attaches the lifting gear not the crane operator who needs to know about centriods and even then the real trick is getting the slings or other lifting devices in the exact place. That tends to be a bit of trial and error unless the lifting points are clearly marked.
Q:How to build a tower crane?
Nowadays, most tower cranes used in construction sites have self lifting function, but they can not leave the coordination of cranes when they are installed.Here's the tower crane installation:1, track laying: few walking tower crane, if the working position is not changed in a stage, rail crane fixtures will be locked.Some tower cranes have no running wheels, and the tower cranes are installed directly on the required basis.2. Install the tower crane chassis parts: installation requirements, installation, and placed in the location of the weight block.3. Install the basic tower, revolving parts and tower cap.Each tower crane has the basic height of the tower installation, the installation height of the rotating device and tower cap, these work is the use of sufficient lifting capacity of the car crane to complete.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords