TC4608 towercrane / QTZ40B1 tower crane

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Specifications

1. The mast adopts a piece structure. It is convenient to transmit, store and place 
2. The hoist uses double motors 

1. Version: fixed and traveling type
2. Free height: 32 meters
3. Max. height: 140 meters
4. Max. radius: 46 meters
5. Jib end load: 0.8MT at 46 meters
6. Max. load: 4MT at 12.9 meters
7. Hoisting mechanism: JT1
8. Drum capacity: 200 meters
9. Lifting speed: 3.32m/min~60.97m/min
10. Slewing mechanism: HZ-40
11. Slewing speed: 0.7r/min
12. Trolley mechanism: BF-40
13. Trolley speed: 28m/min
14. Power line voltage: 380V/50Hz
15. Color: yellow
16. Counter weight: Stell-structured frame (without concrete)
17. Mast section: 1.6 x 1.6 x 3m 
18. Mast section and mast section connection: by screw
19. Foundation bolt: included (8 sets)
20. Cabin: included
21. Telescoping cage: included 
22. Pump and cylinder: included 
23. Main cable: included 
24. Basic mast: included

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do you get heavy weights on top of a crane?
What okorder.com/... Always wanted to see one erect itself, they just seem to spring up overnight. Wingman
Q:Stephen Crane short stories?
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:Tower crane, this model inside each letter number represents what meaning, ask the great God to inform.TCT7527-20, TC6015A-10E
The basic parameters of the tower crane: a working range: refers to the center of rotation of the lifting hook up center and tower crane horizontal distance. Two, weight: rated lifting weight and maximum weight. The maximum rated lifting weight refers to the biggest boom in quality to allow the minimum amplitude of the tower crane, is one of the main technical parameters of the tower crane. Three, lifting...
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:Tower crane 5610 why call QTZ63 tower crane, 5613 call QTZ806015, call QTZ100
The name of QTZ is the former mechanical standard, Q refers to the crane, T refers to the tower, Z is to indicate the self lifting, and the latter figure represents the nominal torque, the unit is T.M (the standard unit is KN.m)The type of "QTZ63" indicates the hoisting tower crane with nominal lifting torque up to 630KN.m;The type of "QTZ80" indicates the hoisting tower crane with nominal lifting torque up to 800KN.m;
Q:What does "automatic tower crane" mean less than 100 tons per metre?
The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b
Q:crane info?
Mounting a crane on your truck wont need any documents. Operating the crane you mounted is a different story. You need to have a number 8 on your license restriction code. For the modification of your truck by mounting the crane, you need to have it inspected and approved by the authorised agency for safety reasons also. Please be advised that your plan may cause some serious physical injury to yourself and others as well..
Q:How would you be able to tell the difference between a crane fly and a mosquito?
WTF?! That's a fly? I've been misled my whole life!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range