TC4208 tower crnae

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. 4T tower crane

2. Factory price

3.block mast section, strengthen

4.Advanced painting process

5.ISO,CE, GOST

Our various model goodsas follows:

1.Topkittower crane (4-12 tons)-

QTZ40,QTZ50,QTZ63,QTZ80,QTZ100,QTZ125,QTZ250,QTZ315

2.Flat top/Hammer headtower crane (4-10 tons)-

QTP4810,QTP5010, QTP5210,QTP5510, QTP5515,QTP6016

3.Luffing tower crane(8-12 tons)-

QTD100,QTD125,QTD160,QTD300

4. Building Hoists(SC200/200, SC100/100, SC100, SC200) single cage or double cages. load capacityis 1 ton/cage or 2 tons/cage

5. Aerial suspendedplatform(ZLP630)

Company Information

Professional tower crane manufacturer in Supplying/Offering Brand New Self-erecting Tower Crane with new HYCMBrand. Export To More Than 20 Countries With CE/ISO Certificates.

Two manufacture factories and 5 produce lines for topkit tower crane, topless tower crane, luffing towercrane, construction hoists and aerial suspended platform.

   Our company qualitypolicy is leading in the development of science and technology, managementof standardizing, quality first, customer satisfication and struggle towardsquality goal that is no accident and zero defect.

   Our brand "HYCM"Tower Crane has got a high reputation at home and abroad due to our quality andcredit. We have after-sale offices in almost all the provinces in China.  

   Gathering allcorners of the land and making friends all over the world, the company willcooperate with the masses of knowledgeable people of all circleswholeheartedly, to connive the great cause and to create the resplendence.

Inquires QA:

My dear friends, If you need any towercranes, please tell us the below basic parameters:

1. Building height or tower crane workingheight.

2. Max load capacity and tip load capacity.

3. Span or jib length

4. Other Special requirements

Welcome to contact us! Believe will be your best choice!

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How's electricity delivered to Overhead Cranes?
Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
Q:what is the meaning of the color red in the book The Red Badge of Courage by stephen crane?
Wound while in battle is symbol of bravery, hence the blood stain as proof or evidence.
Q:1000 Paper Cranes?
The okorder.com/
Q:what is the correlation between moment and toppling cranes?
First of all, let's think of a crane like a giant see-saw, where the plank itself doesn't have any weight. Now cranes have big weights on one side of the pivot, which they can move along (I think, I may be wrong). These cause what is called a 'turning moment'. The further out from the 'pivot' they are, the greater the moment. The other consideration with a crane is it's load. Generally, this is carried a lot further out from the pivot point, on the opposite side from the weights. Now consider this. If you have a small child sitting on the end of a see-saw, you will be able to balance them with a larger person sat closer to the pivot. This is the principle on which cranes work. The moment is the force times the distance from the pivot, and it must be balanced turning each way for the see-saw/crane not to topple. This is somewhat of a simplification, but hope it helps.
Q:Which is the main basis for the disassembly and assembly process planning of tower cranes?
.0.11 tower cranes should be prepared before the installation of special construction program, and should include the following contents:1 project overview;2 installation location, plane and elevation;3 types of tower cranes and technical parameters of performance;4 basic and attachment device settings;5, climbing conditions and adhesion nodes detail;6 installation sequence and safety quality requirements;7 weight and suspension position of main mounting parts;8 installation of auxiliary equipment type, performance and layout;9 power settings;10 construction personnel allocation;11 rigging and special tools;
Q:What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.
Q:Why is house walking with a crane? Is he disabled? How did he get disabled?
I dont know how, maybe polio, but he does have a disability.
Q:How are high rise cranes erected?
Like an Electra set, they are dismantled then put back together. They are transported in sections along with the counter balance weights. The most solid part is the cab.
Q:how to calculate load capacity of crane?
must be sble to left one in half times weight
Q:airsoft m4 full stock, to crane stock?
M4 Crane Stock

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range