TC 6024A tower crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6024A tower crane is hoisting and conveying machinery which is designed  by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.

All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

400

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

29

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-10.966

11

12

13

14

15

16

17

18

19

20

Lifting capacity(t)

4

3.98

3.64

3.36

3.10

2.89

2.70

2.54

2.39

2.26

2.14

Amplitude(m)

21

22

23

24

25

26

27

28

29

30

31

Lifting capacity(t)

2.04

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

1.35

Amplitude(m)

32

33

34

35

36

37

38

39

40

41

42

Lifting capacity(t)

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

0.99

0.97

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-21.4

22

23

24

25

26

27

28

29

30

Lifting capacity(t)

2

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

Amplitude(m)

31

32

33

34

35

36

37

38

39

40

Lifting capacity(t)

1.35

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

Amplitude(m)

41

42

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.99

0.97

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Calculate the tower crane gantry crane
Is building gantry crane crane, gantry crane is generally used for the port, port crane. Can not be regarded as the tower crane.There are several common types of cranes: overhead cranes, gantry cranes, port cranes, automobile cranes, tower cranes, etc..Gantry crane is a medium and small cantilever crane with simple Longmen.
Q:More than meters of tower cranes must be equipped with red barrier lights at the top
however, tower cranes over 30 meters above the tower shall be equipped with red light on the top of the tower and jib.
Q:What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
Q:What is the torque limiter of the tower crane A: the lift is stopped when the lifting torque is exceeded. B: over gravity
The torque limiter acts as follows: (a)In lifting process, when the weight of the lifting object moves ahead of the trolley when the lever force exceeds the moment limiter, the hook rises, the motor and the trolley forward motor are stopped at the same time, and the utility model has the safety function.
Q:What are the construction cranes? 50
National and trade standards for construction and lifting machineryStandard number, building lifting machinery, national and trade standard nameGB 6974.9-1986 lifting machines -- Nomenclature: Tower CranesGB 6974.1-1986 lifting machinery terminology - lifting machinery typeGB 6974.2-1986 lifting machinery terms - main parametersGB 6974.3-1986 lifting machines - Terminology - General conceptsGB 6974.4-1986 lifting machinery terms - bodies and other componentsGB - 6974.5-1986 lifting machines - Terminology - safety indicating devicesGB 6974.6-1986 lifting machines -- Terminology -- mobile cranesGB 6974.7-1986 lifting machines -- Terminology -- Railway CranesCranes; cranes; GB; 6974.8-1986; terminology; floating cranesGB 6974.9-1986 lifting machines -- Nomenclature: Tower CranesGB 6974.10-1986 lifting machinery terms - portal cranesCranes; cranes; cranes; GB; 6974.11-1986; terminologyCranes; cranes; GB; 6974.12-1986; terminology; bridge cranesGB 6974.13-1986 lifting machines -- Terminology -- gantry cranesGB 6974.14-1986 lifting machines -- Terminology -- cable cranes
Q:What special operators should be equipped for the installation and disassembly of tower cranes?
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:Climbing process of an internal climbing tower crane
Climbing tower crane, usually installed in the elevator shaft building or ad hoc Bay, also can be installed in the cylinder structure, by means of a climbing mechanism increases with the structure increases, generally every building 3~8m, crane climbing a tower, its height is only 20m left and right, lifting height with construction height and.
Q:How many meters of cranes should be in accordance with the anemometer?
The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:Minimum QTZ63 tower crane special electric box open for many A
Tower crane (tower crane) is called tower crane, also known as tower crane, originated in Western europe. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..
Q:Tower crane; command; gesture
1. prepare (note): arm extension, placed above the head, five fingers stretched out naturally, palm forward remain motionless.2. main hook: single hand natural fist, in the head, touch the head3. auxiliary hook: a hand clenched, small arm to immobile on the other hand, elbow, hand hand touch before.4. hook up: small arm to the side of the upper extension, five fingers natural extension, higher than the shoulder, with the wrist as the axis rotation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range