• Table Formwork with Outstaning Performance for High Rise Buildings System 1
  • Table Formwork with Outstaning Performance for High Rise Buildings System 2
  • Table Formwork with Outstaning Performance for High Rise Buildings System 3
Table Formwork with Outstaning Performance for High Rise Buildings

Table Formwork with Outstaning Performance for High Rise Buildings

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
450 pc
Supply Capability:
300000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1. Structure of Table Formwork


         Table formwork is used for the concrete pouring of wall. 

         The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. 

         The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. 

         Pull-push props can be designed according to the project or simply select the standard props. 

         Timber beam formwork is a highly efficient and convenient system for medium area slab project. 

         They can be transported to next position as whole table units whether by trolley or by crane lift.



2.   Main Features of Table Formwork


  •     Light weight

  •     For any storey heights and slab thickness.

  •     Easy connection with adjustable steel clamp

  •     Convenient for construction

  •     Fast in transportation and concrete casting due to pre-assmebled table unit.

  •     Can choose shoring props or towers according to different loadings and height.

  •     An optimum position of the table gravity point can be achieved by selecting the correct suspension points for the crane

        ropes and testing it on site by trail lifts



3.   Table Formwork Pictures


Table Formwork with Outstaning Performance for High Rise Buildings



Table Formwork with Outstaning Performance for High Rise Buildings




Table Formwork with Outstaning Performance for High Rise Buildings





     4.  Table Formwork Specification



  •      Vertical shifting of table formwork is considered simplified on site with the help of Transport fork by crane.

  •      An optimum position of the table gravity point can be achieved by selecting the correct suspension points for the crane    

         ropes and testing it on site by trail lifts.

  •     The shifting trolley enables you to lower the table from the floor slightly and transport the table horizontally to the next    

        location easily.



     5.  FAQ of Table Formwork



     What about of our after-sale service?

     Response will be carried out in 24hours  after receiving any complain or request.

     Aluminum-Frame Formwork cost can be refund after order is confirmed. 

     If the products are not based on the requirements, there will be the relevant compensations made for you.


     What can we do for you? 

 We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    We can provide you the professional design team.    

    We can provide fashionable and newest styles for you.    

    If printing required, please advise asap because the whole set need much more time to complete.    

    Please DO check goods when courier knocks your door and contact us asap if any issue.


    What about the package and shipping time?

     Packing: wood package and adhesive tape

     Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs 

     declaration, it may need 2weeks.

Q:Technical specification for construction formwork safety JGJ162-2008 who has made me please
Template design and construction, from the actual situation of engineering, reasonable selection of materials, scheme and construction measures; should satisfy the template in the transport, installation and use of the strength, stability and stiffness requirements, and should give priority to the finalization, standardization and template template support components, reduce production and installation workload. To improve the reuse rate.The design, manufacture, installation and removal of the 1.0.4 construction formwork shall be in conformity with the requirements of this code, and shall comply with the relevant provisions of the state.
Q:What is the use of building wall formwork support? Thank you
In the construction for concrete cast-in-place construction formwork supporting structure, widely used in steel or timber beams assembled into the template bracket
Q:1, JGJ162-2008 construction formwork safety technical specification;2, JGJ130-2011 construction fastener type steel pipe scaffolding safety technical specifications; the friend has. Send me thanks
3 2.1.12 flying die flying shuttering mainly by the platform board, support system (including beam, support, support, legs, etc.) and other accessories (such as lifting and walking mechanism, etc.). The utility model is a large tool type template, which is called a table mould or a table model because of the appearance of the utility model. Because it can take advantage of lifting machinery, pouring from the well under the floor of the lift out of the transfer to the upper layer of repeated use, so called flying mode. 2.1.13 tunnel mode tunnel shuttering a combination of stereotypes template, while pouring concrete wall and floor of the template, because the shape of the template like a tunnel, it is known as the tunnel model.
Q:Since the building, and I would like to ask some of the basic knowledge to the construction of a unified drawing, plus or minus 0 and the height of the drawings, the roof slope requirements. Now the blue steel reinforced concrete inclined roof beams or do. Here we use multiple beams, and the waterproof, thermal insulation, in tile. Anyway, many shortcomings is wood, attic space basically scrapped, there is a fire started...I would also like to use concrete flat top, that is, do not let, more depressed.If I can use wooden beams, waterproof SBS, hanging plastic extruded board?The construction of plastic extruded board in inclined roof beams hung strong? Construction is not difficult?As well as the 8X11 meters of the roof, 30 degrees slope, sloping roof concrete cost about? I feel modeling and cloth reinforcement are very troublesome, expensive cost estimation
Suggest that you chose to do it according to the roof beams, concrete inclined roof more difficult to operate, workers are not professional if vibration is not so dense, it is easy to Water Leakage.If you really want to use the concrete will have to change the roof to flat roof, since the construction of the team is easy to build, more secure.Cast in place concrete roof generally according to 12CM~15CM.
Q:What is the building template support
(1) the material of the template support: high performance cold rolled steel, thickness of 2.5 mm to 2.7 mm, the new material is characterized by: corrosion resistance, elasticity, strong deformation.(2) the specification of new steel building formwork support:
Q:86335 template support, what is the concept of those advantages
The invention, which is a new type of digital steel formwork support composite structure, will create a rapid development miracle for the construction industry, which can save a lot of wood resources and human resources, and reduce the waste of raw materials. It fully resolved before the support structure defects, installation and disassembly and height adjustment is flexible and convenient, saving labor and material, improve construction quality and reduce construction cost, improve work efficiency, concrete good forming quality, novel and beautiful appearance. By the high praise of the construction sector, the product has broad market prospects, good investment recovery and social benefits.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products