System Scaffolding Ringlock Q235/354 Steel Galvanized

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m.t.
Supply Capability:
10000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ringlock Scaffolding 


Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.

System Scaffolding Ringlock Q235/354 Steel Galvanized

Main Features of the Ringlock Scaffolding


Place of Origin

Beijing, China (Mainland)

Product Name: 

Ringlock Scaffolding

Custom Code

7308400000

Color

Silver, golden

Surface treatment

Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating

Material

Q235,Q345.etc

Package

Customized Package

Payment Terms

T/T,L/C

Delivery Detail

15-25 Days

Quality Control

IS09001 Certification, Quality Test

Standard

48.3*3.25*4000mm 

Ledger

48.3*3.25*3072mm

Ledger End

1.2kg


Advantages


1)To be erected easily and quickly

2)Installed to different angels with rosettes of

    two different hole being positioned there

3)Ringlock scaffolding provides complete flexibility to lock in any angel.

4)Diagonal braces are to be tailored in 

  accordance with the lengths of vertical and horizontal tubes


Product Show

System Scaffolding Ringlock Q235/354 Steel Galvanized

The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.


 

System Scaffolding Ringlock Q235/354 Steel Galvanized

System Scaffolding Ringlock Q235/354 Steel Galvanized

System Scaffolding Ringlock Q235/354 Steel Galvanized

Specification of Ringlock Scaffolding

System Scaffolding Ringlock Q235/354 Steel Galvanized


 

The Standards(Verticals)

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

3000

3/3.25

48

HDG/Painted

2500

3/3.25

48

HDG/Painted

2000

3/3.25

48

HDG/Painted

1500

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

500

3/3.25

48

HDG/Painted

 

The Ledgers(Horizontals)  

Effective Length(mm)

Tube Thickness(mm)

Tube Diameter

Surface Treatment

2000

3/3.25

48

HDG/Painted

1770

3/3.25

48

HDG/Painted

1000

3/3.25

48

HDG/Painted

The Diagonal Brace

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

2411

3

48

HDG/Painted

2244

3

48

HDG/Painted

The bracket

Length(mm)

Tube Thickness(mm)

Tube Diameter(mm)

Surface Treatment

730

3

48

HDG/Painted

Plank

Effective Length(mm)

Width(mm)

Height(mm)

Surface Treatme

2050

480

45

HDG

1820

480

45

HDG

3000

240

45

HDG

2000

240

45

HDG

1000

240

45

HDG

Hollow Head Jack And Jack Base


Length(mm)

Tube Diameter(mm)

Size of Plate(mm)

Surface Treatment


600

38

150*120*50*4

HDG


600

38

150*150*4

HDG

System Scaffolding Ringlock Q235/354 Steel Galvanized

System Scaffolding Ringlock Q235/354 Steel Galvanized












Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Physics question! A man stands on a scaffold...?
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:Scaffold/Industrial piercing?
it will eventually go down. industrials can take up to a year to heal. don't worry about it.
Q:Ariel Atom Supercar, Hypercar or a just a bunch of scaffolding?
No such thing as a Hyper car. It is a Sports car. It does not even classify as a Supercar because its top speed is around 125mph. A Supercar's top speed is 185mph+. A high-end sportscar is 155mph+ A regular sports car is 130mph-155mph. I am counting the Ariel as a sportscar because of its quick acceleration. It is a great car. Very fun to drive. Lasts forever with the Honda Civic engine that it has. It is an exciting car.
Q:Scaffolding/Industrial Piercing Questions...?
Im pretty sure you can have retainers for your industrial piercing if you get it done buuuuut you wont be able to put them in for a couple months cause industrials take a long time to heal. And like the person said below it really depends on your skin tone and what color retainer you buy. You shouldnt have a problem with the industrial though cause people cant see mine if I have my hair down. They take up to 1 year to fully heal. You can swap your piercings out after 3 months but beware it can close up on you if you have difficulty putting it in. You HAVE to wait 3 months before you can put retainers in. Industrials are 14g piercings so make sure your retainers are the right gauge. Your ear will be sore for a long time dear. Mine didnt hurt while getting it pierced cause I have a high pain tolerance but my ear was sore and bruised afterwards. The healing process is very delicate and your ear will be sore for a couple months. Make sure you get the piercing on the ear you dont sleep on. I use a 50/50 solution of Betadine and distilled water. Other piercers have different cleaning regimes though, so listen to your piercer. I always clean it with warm water and use a Q-tip to clean around the piercing. Then I put the cleaning solution on and twist the piercing around GENTLY so the solution will go into the cartilege. I do this 3 times a day and i will do it for a month. Industrials are really delicate piercings so always keep it clean :)
Q:The amount of bowl buckle scaffolding, know the area of 50000m2, height 6m, how to calculate the number of vertical pole,
Area / (pitch X step) = total root number (no +1, because only estimate)
Q:Could you use scaffolding boards for floorboards?
I think that depends on the application and how you want your floor to look. They tend to be about 2 thick and wide (which is good for a scaffold). But most flooring is only 3/4 thick. If you have a way to resaw them that might be good. When I was a kid (1965) I worked in a factory with a wood floor and the boards were 2 thick and about 8 wide. This was a good floor when the factory was built about 1920. Not so good these days. In the right setting they could be very interesting and decorative especially if you can leave the old paint and marks on them.
Q:Bowl buckle scaffold horizontal bar can be oblique
However, the strength may not be enough, depending on the specific parameters.
Q:Specification for bowl scaffold support rod top length of not more than 30cm
Specification for bowl scaffold support rod top length of not more than 30cm
Q:in the safety scaffolding?
If your talking about jobs, try Gladstone in Queensland or Karratha in WA. Plenty of jobs in safety and scaffolding there. Otherwise I don't know what you mean.
Q:Weight of bowl buckle scaffold
Pole name specifications A (mm) B (mm) theoretical weight (kg) LG-60 6004 LG-120 12007.41 pole LG-180 180010.67 LG-240 240014.02 LG-300 300017.31 bar name specification A (mm) B (mm) (kg) HG-30 bar theory weight 3001.67 HG-60 6002.82 HG-90 9003.97 HG-120 12005.12 HG-150 15006.28

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range