Swivel Scaffolding Swivel Couplers with High Performance

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details:

 

Place of Origin:Hebei China

Model Number: GTJ-002

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

 

Packaging & Delivery:

 

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

 

1. Product Information

 

Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Earthwork:The pile cap is shallow, the foundation beam and sand filling quantity is less, the depth is to the outdoor floor 1.5m, so the earthwork construction adopts the mechanical leveling site construction scheme. Backfill soil must be layered compaction, density of not less than 0.9. Construction lap should be compact, interval time should not be too long, in case of rain water, the construction of various types of pipe should be synchronized with the foundation construction.
Q:When scaffolding is erected on the base of the permanent structural concrete
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis
Q:What are the problems with having scaffolding piercing in the ear? (pic inside)?
i've not had scaffolding but i've got a wide range of cartilage piercings and they take about 12weeks to heal... i would just say be careful not to catch it and keep it clean. good luck :)
Q:The relevant provisions of the demolition of the external wall scaffold:
Two, removal of scaffolding, should meet the following requirements:1, the demolition work must be from top to bottom layer by layer, prohibited from top to bottom operation at the same time;2, even the wall must be removed with the scaffolding layer by layer, is strictly prohibited even after the first wall or a few layers of the demolition of the demolition of the scaffolding; demolition of the height difference should not be greater than 2 steps, such as the height difference is greater than the step, should be added to strengthen the wall;3, when the scaffolding down to the bottom of a long rod height (about 6.5m), should be in the appropriate position to set up temporary support reinforcement, and then dismantle the wall;4, when the scaffolding to take the sub section, the demolition of the sub elevation, the demolition of the scaffold should not be removed at both ends, should be added to the wall and lateral oblique reinforcement.
Q:]How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:How to maintain the scaffold after use
To the current structure of the scaffolding parts rust, rust treatment, where the humidity of the region (greater than 75%) once a year, once a year should be painted once again. Fasteners to oil. Galvanized steel. Where there is no zinc plating, should be cleaned after each use kerosene, oil coated rust.
Q:Are Nuclear Matrix and Nuclear Scaffold the same thing?
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:Hello! How much does a scaffold piercing cost... on average?
Location Pierced through from the top rim and coming out on the side rim Procedure can be pierced as two separate piercings and then a long barbell fitted when healed , though more successful and comfortable when pierced straight through initially , the barbell then fitting comfortably as guaranteed to line up exactly This can be multiple pierced with barbells sitting parallel to each other, or designed to sit diagonally forming a cross as well as even being placed vertically from Helix to the lobe. These are only possible where the main cartilage shape of the ear does not protrude preventing a straight passage for the jewellery to sit comfortably. Procedure Needle piercing Complications As there are two piercings and each has the potential to swell a barbell at least 4mm larger than the ear is required to allow for swelling
Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
One is in any uneven slopes and ladder type foundation erection; two is the support ladder type template, template can realize the early dismantling; the three is to achieve early removal of part of the support frame, capable of setting up a passage, with four wing cornice; is the erection of climbing frame, a movable working table, efflux frame, to achieve the various functions of supporting role; five is used as storage shelves, can be used for the erection of a variety of stage, advertising support engineering. The pole is connected with a long press 600mm modulus of arbitrary function, also has a head butt function, provides the convenience for the use of special height. The utility model provides a technical support for the hanging, installing and fixing of the new type of formwork, and the utility model is used for the large-scale standardized template.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range