Swivel Scaffolding Swivel Couplers For Scaffolding System

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Quick Details:

 

Place of Origin:Hebei China

Model Number: GTJ-002

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

 

Packaging & Delivery:

 

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

 

1. Product Information

 

Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What's the difference between scaffold and industrial piercing?
They're the same thing. Different places call them different things.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:Scaffold Piercing Im 15 Help.?
i'm no longer saying you're too youthful. yet a place that pierces with out I.D. oftentimes isn't very sparkling. i could purely ask your mothers and dads to take you to get 2 cartilege piercings (in view that it somewhat is particularly what it is). as quickly because it heals, you are able to placed a bar in it later. i do no longer see why a parent could techniques extra ear piercings on their infant. If it somewhat comes right down to it, you're able to do it your self. purely verify which you do purchase a piercing needle on line (new and interior the equipment) and be sterile approximately it. Use wiped sparkling rings.
Q:Which piercing hurts less - helix or scaffold?
Helix will be less painful. It's kind of obvious that it would be a helix is probably one of the easiest piercings you can get I got mine done when I was like 13 and I didn't even flinch getting it done. A scaffold is definitely more intense. After all there are 2 incisions for this piercings so it's gong to be twice as tough. It's sore haling too, the bar is awkward and when it moves it hurts. A helix is far easier :)
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:Construction scheme of portal scaffold
The height of the erection of the steel pipe scaffold shall not exceed the provisions of this specification 1.0.3.The design and construction of the 1.0.4 door type steel pipe scaffold shall comply with the relevant provisions of the state and the relevant mandatory standards.
Q:The structure that acts as a scaffolding for chromosomal attachment and movement is called what?
The first one is vague. The answer could be the mitotic spindle. It might be kinetochore microtubules. It might be talking about the kinetchores on the chromosomes instead of the microtubules that attach to the kinetochores. It could possibly even be talking about the centromeres, though to me that seems less likely. Neurons in the adult brain (and mature muscle cells?) do not routinely undergo cell division.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Foundation engineering:Square - hole excavation pile - pile - reinforced concrete beam - based backfill. Pile by manual drilling, artificial trolley, concentrated heap of residual soil, automobile Sinotrans earthwork project, the allowable deviation of hole diameter of pile are as follows: 800cm, vertical aperture offset, 10cm < 1%, along the axis, vertical axis direction 7cm.
Q:How to maintain the scaffold after use
Where the bending, deformation of the rod should be straightened, damaged components should be repaired before they can be stored in storage, or should be changed.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range