Swivel Scaffolding Swivel Couplers Best Choice for Scaffolding Applicaiton

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details:

 

Place of Origin:Hebei China

Model Number: GTJ-002

Type: Scaffolding Parts

Material: Q235

Weight: 0.58kg to 0.65kg

Surface Treament: as your requirements

 

Packaging & Delivery:

 

Packaging Detail: CARTONS THEN ON PALLET,OR AS YOUR REQUEST.

Delivery Detail: WITH IN 25 DAYS

 

 

Product Information

 

Product Name

Japanese Type Swivel Scaffolding Couplers

Type

GTJ-S002

Material

Q235

Thickness

2.5mm or 3mm

Weight

0.58kg or 0.65kg

Surface Treatment

Electroplate Galvanized

Products’ standard

Fit for JISA8951

Dimensions

48.6   x 48.6mm

MOQ

10000PCS

Product feature

anti-rust,   skid proof, high breaking strength

Swivel Scaffolding Swivel Couplers Best Choice for Scaffolding Applicaiton

Cup-lock Scaffolding Specification:


  • Packaging Detail: vinner case,20ft,21T/GP,by sea;or welded on the cup lock vertical then bundle on steel pallet or Customer needs.

  • Delivery Detail: 1 month after the contract or as customer's requirement.

  • GREAT REPUTATION CUP LOCK SCAFFOLDING

  • Three Year Warranty

  • Operating Friendly

  • Full Safety Devices

  • Provide OEM service

  • Reasonable price

Advantages of using CNBM coupler system

Increasingly, the use of mechanical couplers has been recognised by engineers and contractors to bring about benefits that can accelerate construction speed, increase productivity and simplify design details.

couplers save on lap lengths and could result in lower construction cost

Enhances construction speed by replacing the slow and tedious traditional methods of planting starter bars (e.g. boxing-out or drilling through formwork in wall construction, planting of starter bars into the soil in top-down construction)

Reduces congestion in lap zones, thus enhancing concrete flow.



FAQ of Ring-lock Scaffolding:

Consent Authority (BCA) for the issue of a Building Consent or a Code Compliance Certificate in relation to the Building Act 2004, as well as these Best Practice Guidelines, should be considered to ensure that all practicable steps are taken to assure the safety of the structures and of end users.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do I twist my scaffold piercing?
Why are you using Claire's crap? You need to be doing sea salt soaks twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. Don't twist them as that drags in crust and bacteria and tears up the inside of the piercing. Stop trying to pick stuff off from your ear and go have a reputable piercer check out the scabbing, it could be crust it could be something wrong. If your piercer didn't tell you to do sea salt soaks to keep it clean go to a better piercer.
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:Can anybody provide me the formula for calculating scaffold volume on circular tank?
Step 1. Measure the diameter of the tank (D). Step 2. Measure the height (h) for a vertical tank or length (l) of a horizontal tank. Step 3. Calculate the cross-sectional area of the tank using Equation 1. Equation 1: Cross-sectional Area, A = 3.14 x D x D/4 Step 4. Calculate the volume of the tank in cubic feet using Equation 2. Equation 2: Volume in cubic feet = A x h [for a vertical tank] Volume in cubic feet = A x l [for a horizontal tank] Step 5. Convert the volume of the tank from cubic feet to gallons using Equation 3. Equation 3: Volume in gallons = (Volume in cubic feet) x 7.48
Q:Fastener type steel pipe scaffold composed of which components?
3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:Fastener type steel pipe scaffold accessories
Steel pipeScaffolding steel pipe should be used outside diameter 48mm, wall thickness of 3.5mm welded steel pipe, can also be used outside diameter 51mm, wall thickness of 3.1mm welded steel pipe. The maximum length of the steel pipe used for horizontal horizontal rod shall not be greater than 2m; the other rods shall not be more than 6.5m, and the maximum quality of each steel pipe shall not exceed 25kg, so as to be suitable for manual handling.
Q:The outer hanging scaffold board 12 embedded parts embedded in the crack?
Cantilevered scaffold generally has two kinds: one kind is each layer of a pick, the vertical rod at the bottom of the top in the construction site, floor beam or wall, outward tilt after fixed on the upper part of the erection of scaffolding construction, rail laying layer, construction of a story, to be transferred to the upper layer, and then re ride scaffold provides a layer of construction; the other is the multilayer cantilever scaffold, the full height is divided into several sections, each section of the erection of a height of not more than 20m, the use of cantilever beam or cantilever frame for scaffold based subsection overhanging scaffolding section, this method can use scaffolding over 50m the overhanging scaffolding facade to be set up scissors.
Q:Scaffolding steel planks with rubber end caps?
Maybe something like a window washers scafolding planks...?
Q:How to solve the problem of scaffold pipe repair
ST100 type hyperbolic steel pipe straightening machine adopts staggered rolling rotary straightening system, the 4 line rolling wheel revolves around the steel pipe:
Q:scaffolding piercing.. do they hurt? and how much are they in england? thanks x?
Yes, they hurt, quite a lot. But how rad they look outweighs the pain. :D

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range