Stud and Track Galvanized Structural Steel Profiles From China

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 pc
Supply Capability:
550000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

DRYWALL PARTITION PROFILES

 

Material                

Galvanised steel

Ceiling Channel for ceiling system
1. Supporting channel: 38 x 12mm, 38 x 20mm,  50 x 15mm, 60X27mm
2. Covering channel: 50 x 19mm, 60x 27mm ,35x22mm
3. Length: 2. 7mm, 2. 8mm, 2. 9mm, 3. 0mm
4. Supporting channel: 0. 5mm, 0. 6mm, 0. 8mm, 1. 0mm, 1. 2mm
5. Covering channel: 0. 35mm, 0. 4mm, 0. 45mm, 0. 5mm, 0. 6mm
6. Wall angle: 25 x 25 x 0. 4mm / 0. 5mm / 0. 6mm
 

 

Zine Coated Level

60~270 g/m2 (depends on the customer's request

Application
1,Supermarket, marketplace

2,Underground, air port, bus station
3,Building lobby,metro station

4,Hotel, restaurant,railway station

5,School, office, meeting room ,hospital

6, commercial building

 

Advantages and Features:

1.Light,good strength,cauterization resistance and water resistance

2.Matching magnesium fire-proof board,gypsum board and many other wall and ceiling board

3.Moisure-proof ,shock-resistant,high-effcient and environmentally-friendly

4.Easy and fast for installation,time-saving

5. Prompt delivery, high quality ,competitive price and complete sets of styles

6. We can supply you the products based on your specific requirements

Other Products Available:

38 light steel main channel,50 light steel main channel,60 light steel main channel,75 stud,100 stud,.50 track,75 track,100 track.

 

FAQ

1. Is OEM available?

Re: Yes, OEM service is available.

2. Are you factory?

Re: Yes. we are the largest factory in China.

3. Can we get sample?

Re: Yes, sample is free for our customer.

4. How many days for production

Re: usually 2 weeks after receiving of downpayment

 

Pictures

Stud and Track Galvanized Structural Steel Profiles From China

Stud and Track Galvanized Structural Steel Profiles From China

Stud and Track Galvanized Structural Steel Profiles From China

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to fix the middle of the light steel keel to the roof and the ground, the keel has a joint?
First with the expansion bolts fixed heaven and earth keel and roof and the ground, the middle with a vertical keel; if the layer is too high, then the keel will have joints, of course, have special connections.
Q:In a layer of 6 meters high in the big room, do 2.8 meters high light steel keel partition. Big room to do mineral wool board ceiling, how to connect the two?
If the middle of the empty iron angle, it is estimated that the master will be in the corner iron welding rods down to install! Some of the master will use wire hanging, but many people do not use the iron wire rod. Then install baking paint or paint keel, Put the mineral wool board up just fine!
Q:Now what is the room wall material is fashionable? Environmentally friendly
Sound insulation cotton how to be environmentally friendly too old and toxic The best material is lightweight partition wall insulation insulation and non-toxic light foam cement board wallboard calcium silicate partition board and keel plus paint-free green frog Non-toxic dalfers are currently my best found some non-toxic
Q:What is the light steel keel gypsum board partition? What are the characteristics?
1. Wall shrinkage deformation and board cracks: the reason is the vertical keel tight top and bottom keel, no extension of the amount of stretch, more than 2m long wall is not controlled deformation joints, resulting in wall deformation. The wall should be left around the gap 3mm, which can reduce the temperature and humidity caused by the deformation and cracks. 2. Light steel skeleton connection is not strong, because the local node does not meet the structural requirements, the installation of local nodes should be strictly in accordance with the provisions of the law. Nail spacing, location, connection method should meet the design requirements.
Q:Light steel keel partition wall how to paint
Partition wall painting method: 1, knock on the wall, listen to the sound to find the vertical keel (light steel vertical keel has 5cm width), and then thinner steel needle piercing, to confirm the location of the vertical bone. Select the length of 25mm or more dry wall nail into the load the weight of the whole painting, and then fixed on both sides of the gypsum board position on the balance of the line; 2, before doing the partition, you can consider in the predetermined location plus fine woodworking backplane for later use.
Q:PVC plastic buckle the corners of the corner is how fixed to the wall of the buckle is how and cords connected to the light steel keel and gypsum do cut off the light steel keel is how and the wall surface and ceiling how fixed
Plastic buckle the corners of the line, the normal practice for the eye plug plug stopper, with self-tapping screws fixed. Plastic buckle has its own slot, in the male slot with self-tapping screws fixed on the keel. Light steel keel gypsum board wall, with the heaven and earth keel to the ground in the ground punching cork with nails fixed; Tianlong the same.
Q:Light steel keel partition wall how to get, and how to purchase materials and tools, I now empty-handed, the best comprehensive ~!
Like your height of the wall, you can choose the C75 series of light steel keel, if you have to take into account the water seepage you can use waterproof gypsum board (face layer paper is green, ordinary is gray) As for the installation like home this Do not need to use the impact of drilling holes. Put a good, can be directly in the light steel keel in the ground to the keel skulls assembled to install in place, on the top of the keel placed woodworking plate, directly into the nail into the nail, of course, the gun was selected models of the same big. The side is also so fixed on the wall. The gypsum board is fixed on the light steel keel by self-tapping screws
Q:Shanghai Light Steel keel ceiling Shanghai plant decoration office building decoration light steel keel ceiling wall
Reasonable top design Also in the plant decoration should also pay attention to the top, the top of the plant is usually high, and most of them are steel frame, in the decoration of the top of the first design fire, ventilation, and the central air conditioning reasonable arrangements , Because these are plant decoration necessary hardware facilities, especially fire. The next is based on the use of the requirements to determine whether the ceiling of the problem, the plant ceiling a lot of material, if the beauty can be used for some mineral wool sound board, gypsum board, and other materials to do the top decoration, you can not do any ceiling, The top of the need to hide or not some of the facilities to do some local modification is also a modern minimalist design.
Q:Light steel keel should be how to strengthen, in order to make solid wood door installed more prison?
Now that you have used the light steel keel to make the wall, it is only reinforced with wood.
Q:Light steel keel wall how to calculate
According to the actual calculation of the amount of work to square meters for the calculation unit, the price of both sides negotiated or set quotas. According to how you talk about the calculation, if not talk, the market is calculated by single-sided!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range