Steel Scaffolding / Standard Scaffolding / Scaffolding system

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
2 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Scaffolding / Standard Scaffolding / Scaffolding system


Product Description:

1).Frame system scaffolding is light duty,easy to erect and walk through,wide appciations for both inside and outside constructions.

2).Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

3).Frame system scaffolding  is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .

4).Frame system scaffolding   can be used for the building decoration which is the light duty scaffolding,it is more easier for moving.


Steel Scaffolding / Standard Scaffolding / Scaffolding system


Steel Scaffolding / Standard Scaffolding / Scaffolding system


Steel Scaffolding / Standard Scaffolding / Scaffolding system


Steel Scaffolding / Standard Scaffolding / Scaffolding system


 

Use: 

Presented like a shape of door,Frame-connected Scaffolding includes main frame,horizontal frame,cross brace,stage board and adjustable base. In order to display frame with coupler system enough, good performance of stability, firm structure of the whole, easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

 

Material: 

Q235 or Q345


Finishing: 

Hot dip galvanized or painted(anti-rustiness).

 

FAQ:

What is our service to you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.   

    We can provide you the professional design team.   

    We can provide fashionable and newest styles for you.   

    We can design the artwork for you.   

OEM accepted--please feel free to customize. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 3?
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:A 54.5 kg painter is on a uniform 23.0 kg scaffold supported from above by ropes .?
I am looking for as shown, as I am not psychic.
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
Q:What kind of insulation materials and equipment are allowed to be imported in China?
One of China Polypropylene board (EPS board) or extruded board (XPS board), extruded board special interface agent
Q:On the issue of compensation after the event of force majeure
It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~
Q:At the scaffold, Dimmesdale sees 3 people before Hester and Pearl. Who are they, what do they represent?Help!?
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range