Steel Scaffolding Pipe Clamp FOR SALE

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 set
Supply Capability:
30000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place   of Origin:

Shandong China (Mainland)

Brand   Name:

FF

Model   Number:

FF-0006

Type:

Scaffolding Parts,scaffolding pipe clamp swivel clamp

Scaffolding   Part Type:

Scaffolding Couplers

Material:

Q235

Color:

Silver

Surface:

hot dip galvanized

Size:

48.3mm

Weight:

1.75kg

Remark:

scaffolding coupler manufacturer

Standard:

OSHA

Technology:

dorp forged





Packaging & Delivery

Packaging   Detail:

Woven bag and   pallet

Delivery   Detail:

20-30days

Specifications

Galvanized Steel Scaffolding Pipe Clamp 
Size: 48.3mm, 
Weight: 1.75kg 
Surface: hot dip galvanization

Item

Steel   Scaffolding Pipe Clamp

Material

Q235

Dimensions

 48.3mm

Weight

1.75kg

Surface

Hot-dip   galvanization, electro galvanization

Standard

OSHA

Note

OEM   service is available

MOQ

1000pieces

Package

 

Woven   bag and pallet

Payment   Terms

TT,L/C,   we can contact in detail

Delivery   Time

 

20-30days

We are a professional manufacturer and supplier of scaffolding systems, ringlock scaffolding,cuplock scaffolding,scaffolding couplers and other scaffolding accessories.


Welcome to visit our factory !

We would like to establish business relationships with your company!

We specialized in producing welded square tube, rectangular tube, round pipe, galvanized pipe and scaffolding products.

Our company owns the first class professional tecnique adviser in China, and the excellent staffs with professional technology. 

Our mission is: Quality is the First, Client is Supreme ! 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.
Q:How long after getting an industrial/scaffold ear piercing does it stop hurting?
When I got my ears pierced professionally, they only hurt for a couple days, maybe a week if I messed with them too much. Later, I personally double pierced my earlobes with a sterile needle at home, it's been over a month and it still occasionally hurts when I sleep on it weird. That is my experience, however it depends if they use a gun or a needle, where exactly you have it pierced, and other factors still can change (infections) the amount of healing time. But a good ballpark figure is about 1-2 weeks, but I know people who's pain can last a month. Good luck, and make sure you find a good professional piercer, and not the local mall free piercing preteen shops :).
Q:How long is the service life of disc scaffolding?
Will bring to the construction of a series of security risks, Hunan Billiton Industrial Group Co., Ltd. to provide information is generally 3-5 years
Q:What are the safety requirements for the dismantling of construction scaffolding
(3) prior to the dismantling of scaffolding, the scaffolding should be retained on the material, debris and other clean, and should be removed by the removal of mechanical equipment, electrical and other pipelines, such as demolition, or to be protected.(4) the dismantling of the scaffolding should be unified command, should be approved by the construction plan, the requirements of the work instructions, from top to bottom in the order of the upper and lower levels are strictly prohibited demolition operations.
Q:Industrial/Scaffolding piercing swollen and sore?
1. go and see the piercer... 2. go to a doctor 3. kepp doing what your doing
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
hey...i'm trying to figure out the same thing....weird.
Q:What is the mobile scaffolding materials
The overall life of cold galvanized mobile scaffolding accessories for about 5 years, the surface does not require maintenance, moderate cost. The main processing technology: the welding of the scaffolding parts and then galvanized, the surface of each part, are galvanized
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.
Q:I want to know the classification of scaffolding in the building
Material division according to bar1) single specification steel pipe scaffold. It only uses a steel pipe specifications, such as steel tubular scaffolding, welded steel pipe using only 48 * 3.5.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range