Steel Ringlock Scaffolding Brace/ Bay Brace / Diagonal Brace CNBM

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 Steel Ringlock Scaffolding Bay Brace/Diagonal Brace

Name

Steel Ringlock Scaffolding  Bay Brace / Diagonal Brace

Place of Origin

China

Brand name

CNBM

Size

Ø48.3*3.25*1000/2000/3000 or as your request

Main Material

Q345 ,Q235, Q195

Surface Treatment

High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.

Color

Silver, Orange

Certificate

SGS, EN74, ISO

Features

Automatic Welding

Service

OEM Service available

MOQ

50ton

Payment

T/T or L/C in sight

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request

production capability

100 tons per day

Steel Ringlock Scaffolding Brace/ Bay Brace / Diagonal Brace CNBM

Futures:

Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.

Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

Low maintenance:The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

 

The specification Ringlock Brace/Bay Brace/Diagonal Brace


Ring Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

Steel Ringlock Scaffolding Brace/ Bay Brace / Diagonal Brace CNBM


FAQ

1. What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

2.What are the certifications of your products?

Certified by SGS, BS1139, EN74, Local Test Report.

3. How long is the warranty period for your product?

Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The use of the scaffold in The Scarlet Letter..?
its when Hester, Pearl, and Dimmesdale are standing on it in the middle of the night and Chillingworth sees them. Dimmesdale is there because hes doing the same thing Hester had to do just without the whole town watching =]
Q:Does the Scaffold Ear Piercing Show?
you will get your bellybutton pierced or you will get your 2nd ear lobe holes pierced in case you have already got your first ones.. my widespread is the cartilage...I even have my spectacular cartilage pierced and that i like it.. verify you get a small stud nevertheless...you dont wanna seem TOO flashy stable success!!
Q:Wankou scaffolding steel pipe scaffold and look like
The steel pipe scaffolding is composed of fasteners and shelves, each of the shelves are connected with the fastener
Q:CAN I GET AN INDUSTRIAL/SCAFFOLD PIERCING ?
You can definitely get it! When you go in to get it they'll just measure the length from side to side of your ear and pick a bar according.. then you'll just have to go through the piercing process which isn't bad at all. Good luck!
Q:Wheel buckle scaffolding and scaffolding, do.
Whether the hole on the vertical rod is a new steel plate. Some poor businesses use scrap steel plate stamping, uneven force, very easy to damage. 3 the plug on the horizontal bar is cast steel. The cast steel is more tough than the cast iron, the strength is large, and it is not easy to damage. 4 whether the surface treatment is electrophoretic paint. Ordinary spray paint anti-corrosion time is limited, easy to fall off in the process of use...
Q:(1)Why do we paint building and steel.(2)what are coarse and aggregate.(3)what are formwork and scaffolding.?
1. ) We really need to paint building and steel to prevent from rust, by then it will help the structure to last long..We all know that rust is one of the problem that loosen the strenght of steel.. 2.) Construction aggregate, or simply aggregate, is a broad category of coarse particulate material used in construction, including sand, gravel, crushed stone, slag, and recycled concrete. Aggregates are a component of composite materials such as concrete and asphalt concrete; the aggregate serves as reinforcement to add strength to the overall composite material.
Q:Bowl buckle scaffold is not a pipe fitting scaffold
The buckle of the bowl buckle scaffold can be welded with a bowl buckle, and the node is mainly fixed by a bowl buckle
Q:Scaffold piercing question please help, is it normal?
There are a lot of viruses/allergies/sinuses going around right now, and I would say that the swollen glands aren't from the piercing, but it could very well be a lymph node in your neck with a collection of white blood cells grouping together to go fight the bacteria possibly from the piercing. And the stinging is fine, mine hurt for a really long time after I got it. Actually it still hurts quite often. But just keep applying the sea salt mixture three times daily and you should be healed up in no time! (:
Q:Is there a way to find out when specific scaffolding is scheduled to come down in New York City?
Well on every building that has construction on it there's a little section that he paper work and permits all over it ( usually at street level) so I'm going to guess if you can obtain the constructions companies phone number from those paper you can call and ask when the scaffolding is coming down.
Q:for how long must hester prynne stand on the scaffold ? The Scarlet letter a?
I don't know, but you know who does probably know? Nathaniel Hawthorne. Why don't you read that book he wrote, the scarlett letter. The answers probably in there.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range