Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Ref Price:
Loading Port:
Guangzhou
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
10000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

(1) Steel Structure of steel prefabricated houses

Light Guage Steel Villa is more stable than the one that made of welding frame steel . Besides, it is cheaper, more economic. With long lifespan,  which can last almost 70 years, all the materials of light guage steel villa is Q550.  It is locked with bolts, which can be used repeatedly without any maintenance.

 

(2) Flooring of prefabricated house

Decoration:PVC flooring,carpet,laminated flooring ,solid wood flooring 

Floor:Plywood ,galvanized deck +concrete,calcium silicate board

Insulation layer:glass wool

Floor purlins:retangular pipes and C-shaped steel 

Floor beam:retangular tube,pipe truss,truss angles ,hot-rolled steel H 

Ceiling:calcuim silicate ceiling 

  

(3) Windows and Doors of prefabricated house

Windows: Double glazing plastic-steel or aluminum alloy thermo-insulating frames

Doors: steel security gate doors; wood or molded doors

 

(4) Composite Wall System (thickness:150-250mm) in prefabricated house

Decorative layer :PVC cladding ,PU metal cladding ,single metal cladding ,calcium silicate board

Insulation:EPS sandwich panel,PU sandwich panel ,glass wool sandwich panel

Ring beam:Cold retangular tube ,pipe truss.

Steel column:Cold retangular pipe,hot rolled steel H 

 

(5) Roofing System of prefabricated house

1. Asphalt tile

2. Cement tile

3. Clay tile

4. Color steel tile

5. Glass fiber tile

 

(6)  Benefits of prefabricated house

Energy saving - heat transfer coefficient k=0.24w/sq.m.k
Avoid thermal bridge in walls, floor and roof
Water saving - more than 90% saving
Low waste - no pollution

Sound insulation: walls-51db, ceiling-78db
Use almost entirely recyclable materials
Low dust pollution - in city construction

(7)  Application of prefabricated house

 

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

Steel Prefabricated House Light Steel Villa Two Floors Aspahalt Tile Roof

 

 

(7)  FAQ of prefabricated house

 

1.    Q: How much is this house?

A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.

2.    Q: Do you do the turnkey project?

A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.

3.    Q: How long will your house stay for use?

A: Our light steel prefab house can be used for about 70 years.

4.    Q: How long is the erection time of one house?

A: for example one set of 200sqm house, 8 workers will install it within 45 days.

5.    Q: Can you do the electricity,plumbing and heater

AThe local site works had better to be done by the customers.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Villa (self-built buildings) feng shui to pay attention to what?
1. Villa houses can not be built on the ridge, or the valley of the entrance, or not only can not get the geographical Fukuzawa
Q:Buy second-hand villa need to pay attention to what?
but not the same landscape you dig the "silver" are also different.
Q:What is the height of the villa house?
we usually do some villa indoor doors are often in the size of 2200 * 900 , 2300 * 900,2400 * 900 and some other ultra-wide and wide size.
Q:What is the price of the villa decoration?
Shanghai 400 square meters villa decoration offer according to the decoration style and grade to be different, probably estimated cost between 50 million -100 million
Q:What is the villa residential property management content?
customer service: the occupation registration, customer reception, customer contact
Q:What is the difference between a house and a villa?
the house belongs to the class villa, but the quality of living or lower than the villa, the villa into the door all belong to their own space, and independence. Bungalows generally a layer of 2, there is a flat area
Q:Is the area of the villa terrace not included in the building area of the villa?
Building area, is a real estate noun, and the use of area and the use of a direct relationship between the calculation
Q:Why is someone called him called "Do not wild?
1 is not wild, is the "villa" another title, perhaps some people first saw the "villa" rhetoric, because of wrong or do not understand and read wrong.
Q:What is the most important thing to design a villa?
As the villa area is large, many people think that the function should not be a problem, this is actually a misunderstanding
Q:What are the taxes to sell the villa?
Government tax regardless of villas or apartments, only divided into ordinary residential, non-ordinary residential and moving rooms.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range