Steel-plastic Geogrid with Convex node for mine

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
888 m²
Supply Capability:
280000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Structure of Steel-plastic Geogrid with Convex node for mine description :

 

Made of steel-plastic straps with arabesquitic on the surface , it can bear high tensile strength .This material has considerable tensile strength in longitudinal and lateral directions. This chain structure can effectively bear and diffuse forces on soil and is applicable to large area permanent load bearing foundation as a reinforce.

 

Features of Steel-plastic Geogrid with Convex node for mine:

Homogenous structure, low creepage ,anti-aging and resisting acid and alkaline.

Steel-plastic Geogrid with Convex node for mine

Application of Steel-plastic Geogrid with Convex node for mine :

Make reinforce treatment for various of soft soil foundation to evenly distribute load stress and reduce unevensettlement , it is easy to wash coal . used in highway ,railway,port,airport, municipacl and projects of supporting in the recovery working face of coal mined and ladeway in the coal mine .

Specification of Steel-plastic Geogrid with Convex node for mine

TGSG15-15,TGSG20-20,TGSG25-25,TGSG30-30,TGSG35-35,TGSG40-40,BP15-15MS,HPP20-20MS, HBPP25-25MS,HBPP30-30MS,HBPP35-35MS,HBPP40-40MS

Width : 1M,2M,3M,4M.

Length: 50m,100,

Color: black

Packaging & Delivery of Steel-plastic Geogrid with Convex node for mine: Each roll is wrapped in a woven bag then into container Or Packed as customers' requests.

Production periods of Steel-plastic Geogrid with Convex node for mine : within 10 days after receiving the deposit

 

Introduction of CNBM

 

China National Building Materials (Group) Corporation (CNBM) is a state-owned enterprise in charge of administrative affairs in China building materials industry. Established in 1984, CNBM is a large group corporation of building materials with total assets of RMB 25 billion and a total staff of 30,000. Now CNBM owns more than 200 subsidiaries in and abroad the country, including wholly-owned corporations and joint ventures.

 

 

FAQ of geosynthetics :

 

What is geosynthetics ?

 

Geosynthetics form a perfect erosion control fabric used extremely widely in civil engineering to stabilize and reinforce slopes and soil under or next to roads, railways, dams, water reservoirs etc.. They can be easily applied which minimizes the time of construction, as well as they limit the resources and materials necessary.

 

What kinds of geosynthetics we have ?

 

Non-woven geotextile, geogrids, geocells, GCL, Geomembranes, Geonets, Geocomposites etc .

 

What is the geosynthetics used for ?

 

Hydraulic

 Lagooning and Water Treatment, Ornamental Ponds, Golf Courses

 Aquaculture and Desalination,Water Lagoons,Tanks, Reservoirs, Liquid Waste,Floating Cover Solutions, Drainage and Filtration

 

Environment

Tailing ponds, Leach mining,Landfills,Landfill Capping,Protection against corrosion,Vertical Barriers

 

Civil Works

Erosion Control,Secondary Containment,Tunnels,Linear and Surface Works,Consolidation of Margins,Soil Reinforcement,Soil Separation.

Building - Parkings,Roofing,Soundproofing

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Roof membrane waterproof construction process, what should be noted that?
Four do not: 1 surface can not afford sand 2 surface can not afford skin 3 surface is not crisp 4 does not crack
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
5, in strict accordance with the underground waterproofing procedures for concrete construction and construction of waterproofing membrane, a reasonable set of settlement and construction joints, to reduce the structure of the crack; for the structure of stubble, settlement joints, construction joints to take the necessary waterproof measures (additional Waterproof layer or set the water-stop plate, water strips, etc.). 6, to strengthen the hidden acceptance, the good quality off.
Q:I would like to ask how to do in the warm water above,
I do not do 80% of the warm water, of course, the use of good quality water pipes, waterproof water is generally done in the following to do, if done in the warm tube above will affect the heat of the floating, to warm the following covered with a Layer insulation layer and then covered with warm tube to, and then beat the water to ensure that no leakage. And finally in the above covered with wooden floor or floor tiles.
Q:Eastern rainbow waterproof how to do
especially small places to pay attention, such as: sewer such as. And then dry about 10 hours or more, (see the environment may be, like a dry) so repeated 3 side painting is appropriate.
Q:Find the construction steps for waterproof coatings
2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
4, the preparation of finished products: according to the pavement area required to calculate the semi-finished products, the required slurry and prepolymer were lifted to the console, according to batch release neatly. Place the desired vinyl particles and catalyst into the appropriate position on the table.
Q:How can the toilet waterproof works fail?
After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment.         Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures.          After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list."         Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
Q:What is PE waterproof cloth and PVC tarpaulin
PE tarpaulin, anti-aging, anti-aging, anti-corrosion, light, easy to fold, relative to the PVC tarpaulin, PE tarpaulin cheaper price for the freight yard, the service life will be shorter.
Q:How to do waterproof bathroom, construction process is what
4, closed water test. Closed water test, the highest point of the ground water can not be less than 2 cm, save at least 24 hours, observe the phenomenon of no leakage after the operator. If there is leakage, need to redo, and can not neglect.
Q:Can Henkel have water against him?
In order to ensure the quality of the proposed do not add water, the general finished materials are proportional, emulsion and powder, in strict proportion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range