Steel Ladder Scaffolds System whole sale CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

·                                 Model Number: LF Scaffolds 

·                                 Application: For house bulding

·                                 Certification: SGS

2.Packaging & Delivery

Packaging Details:

Delivery Detail:

Steel tube is packed in bundles with steel strips; coupling is packed in   carbons.

20 days after the deposit

Durable steel scaffolding systems tube&coupling

3.Details

1. Scaffolding systems tube&coupling is one of the most labor intensive scaffolding systems,but the return on time investment is nearly umlimited adaptability and access to even the most unique jobsite.

2.The normal size of scaffold tube is 5.8 meter long,diameter 48mm. It is compatible with scaffolding couplers 48.6*48.6mm or 48.3*48.3mm.

3. Scaffold tube can be joint at any angles you want with three simple components:fixed coupler,swivel coupler and sleeve coupler.

4.The steel scaffold tube are mainly used to cover the outside wall of building,adaptable to any construction situation.However,they are also suitable to support inside concrete walls.

5.The thickness of scaffold tube can be 3.2mm,3mm and 2.75mm,the surface can be black,painted or cold galvanized.

4.Feature

Name

Scaffold 

Material

100% Q235 steel

Length

5800mm

Diameter

48mm

Thickness

3mm

Weight

About 20kg

Surface

Galvanized,black

* 1000 square meter construction site needs about 13 tons of  scaffold tube.

* 1 ton of scaffold tube need about 200 pieces of couplers. 

5.

Model NO.

Height(mm)

Width(mm)

Thickness (mm)

LF 1700

1700

1219

2/2.2

LF 1219

1219

1219

2/2.2

LF 914

914

1219

2/2.2

LF 1524

1524

1524

2/2.2

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Steel Ladder Scaffolds System whole sale CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Prefabricated concrete pipe piles belong to raw materials or structural parts
There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
Q:Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help.
This depends on your choice of products to decide, because now scaffolding collapse accident frequently, we recommend that you must use the national standard fasteners
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Seeking construction machinery safety supervision papers can be greater than 100 words
Q:A 54.5 kg painter is on a uniform 23.0 kg scaffold supported from above by ropes .?
I am looking for as shown, as I am not psychic.
Q:significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:Industrial scaffold piercing? How much does it hurt? When you sleep and lay on it does it hurt? etc.?
Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery
Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
scaffolding load shall not exceed 270kg / m
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range