Steel Girder Beam Galvanized for scaffolding CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FAS-LG1570/2070/2570/3070

  • Material: Steel

  • Surface: Hot dipped galvanized

  • Type: Beam

Steel Girder Beam Galvanized for scaffolding CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model No: FAS-LG1570/2070/2570/3070

Model Name:  Steel Girder Beam for scaffolding  

4.Features:
1) Dimensions (Lx W ): 1570/2070/2570/3070/6140/7710x 500mm,
2) Made of high strength tube and steel plate
3) Used in facade scaffold systems

4) Aluminium one are available
5) Surface: Holt dipped galvanized or according to customers'

 5.

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Prefabricated concrete pipe piles belong to raw materials or structural parts
It is the main component form of a house
Q:scaffold on a tall office building.?
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:Sprinkling water on the construction helps to help reduce haze days
to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:What is the difference between a steel pipe stent and a steel scaffolding? The
Template support and scaffolding are force components can be wood structure, steel structure and prefabricated concrete structure, which is classified according to their use of the general should not share the same structure, so as to avoid the operation of the construction process caused by the template shaking and affect the quality of the project The In general, the template support is through the template to bear the relevant load from the concrete; and scaffolding to bear the construction workers, equipment and construction materials and other loads

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range