Steel Galvanized Scaffolding Forged 17mm Formwork Tie Rod

Ref Price:
$10.00 / pc
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1000 pc
Supply Capability:
2000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

1.Steel Galvanized Scaffolding  Forged Formwork Tie Rod 

What is  forged formwork Tie Rod  ?

Forged formwork tie rod   is accessories of the scaffolding productions , it is usually made of C45 steel material , The production technology can be forging or prssed  , With the development of the construction , the forged scaffolding formwork nut has become  more and more popular. 


Function of the forged formwork tie ros 

Steel Galvanized Scaffolding  Forged Formwork tie rod   used to connect formwork nut  for conceret formwork buliding tower , It used in buliding construction   site  .The common size is 17mm   suitable for 17mm screw tie rod . It can bear pressure on horizontal and leverl direction 


Advantage of  forged formwork tie rod 

Strong ability of resistance to deformation, for different manufacturing process, It can resistant deformation, ensure the product safety and effective use of repeated; Strong anti-sliding performance, joint area is large, fasteners and overcomes the cast iron steel tube a point or line defect of joint, remove of steel pipe slip hazard.


2.Main features of Steel Galvanized Scaffolding  Forged Formwork Tie Rod 

 Reliable performance

 Corrosion resistance

 Durable finish standards   

 Strong anti-sliding performance

 Manugacture 

 Good service 


3.Steel Galvanized Scaffolding  Forged Formwork tie rod    images 


Steel Galvanized Scaffolding  Forged 17mm Formwork Tie Rod

Steel Galvanized Scaffolding  Forged 17mm Formwork Tie Rod

Steel Galvanized Scaffolding  Forged 17mm Formwork Tie Rod



4. Steel Galvanized Scaffolding  Forged Formwork tie rod  Specification

 Raw Material: C45

 Size: 17mm 

 Weight: 1.59 kg

 Certifies:, Element

 Technology : Forging 

 Surface treatment: Electro galvanized, Hot DIP galvanized, or painted

 Brand Name:FF

 Useage: connecting the scaffolding pipe

 OEM service offered



5.FAQ of Steel Galvanized Scaffolding  Forged Formwork Tie rod 

Why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

 Our firm belief that our customer's success are the only guarantee of our success .

 


Package ?

All the products package are suit for the sea transportation, steel and wooden plate is usual,  if you need special   package, Pls contact me for detail, we will meet your demands.


Delivery Time ?

For one 20GP container, the delivery time is about 15-25 days,

For 1-5 20GP containers, the delivery time is about 15-50 days.

For more than 5 containers, pls contact me ,our engineer will give you a delivery plan.

 

Product Quality

1)  we can send you the samples for your checking our quality.

2)  If you have time ,we welcome your coming to visit our factory.

 




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The relevant provisions of the demolition of the external wall scaffold:
Three, discharge should meet the following requirements:1, the structure is strictly prohibited to throw to the ground;2, transported to the ground should be timely inspection of the construction parts, repair and maintenance, and according to the varieties, specifications at any time yard storage.
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Taken from okorder: Vygotsky believed that when a student is at the zone of proximal development for a particular task, providing the appropriate assistance (scaffolding) will give the student enough of a boost to achieve the task. Once the student, with the benefit of scaffolding, masters the task, the scaffolding can then be removed and the student will then be able to complete the task again on his own.
Q:What are the requirements for the construction of the scaffolding structure?
The invention also provides an anchoring device for anchoring a scaffold structure to a building. Arm with longitudinal axis. The anchoring device further comprises an anchoring device which is fixed to the building by the anchoring device and the scaffold structure.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
Third, remove the disc scaffolding accessories should pay attention to remind the construction personnel, in the construction site to fasten safety rope, take good safety helmet, wear good shoes. Don't dress because the weather is hot. Some of the equipment used to go to the mall to see where the extension is more complete.
Q:What's an antonym for the word scaffold?
Since a scaffold is a bridge/ladder/support used to allow you to span the gap between you and and object you wish to reach, I'd go with barrier.
Q:Scaffold Piercing Aftercare?
i love my scaffold/business piercing i do not imagine it hurts yet some human beings say it does Coast round £25/30 - any more desirable than its a rip off. this is a soreness to heal and takes a lengthy time period! each and every time I knocked mine it swelled and went humorous. extremely stressful. Had it executed 3 cases, 1st time it grew out, second time I only took it out. third time I were given it pierced on my different ear and at the same time as it became healed I replaced it to a versatile bar and for the reason that then this is been suitable. desire I helped.
Q:Question about ΣF=0 on a scaffolding (Mechanical Equilibrium)?
You are correct so long as the scaffolding is not allowed to move. I.e. the cables suspending it are locked and not unwinding from their spools as more workers get on. More weight added would necessarily increase the tension in this type of case. However, if, when another worker got on and the tension could not increase for what ever reason, a downward acceleration would take place that is proportional to the worker's weight. Hope that clears things up.
Q:I would like to ask how much scaffolding steel prices
10, the scaffolding removed, should first check to connect with the building, and will remain on the scaffold material, clean, and other debris from the top down, according to the first after the demolition, demolition of first order after installation, demolition materials should be passed down or lifted onto the ground, step one clear. Not allowed to use the method of step down, it is strictly prohibited to throw down or push (pull) down the demolition method.11, take off scaffolding, should be set up warning area, and sent a special alert. In case of more than six winds and bad weather, the scaffolding should be stopped.
Q:Bowl buckle scaffold inspection and evaluation
Bowl buckle scaffold should be checked and accepted as follows:(1) access to the site of the bowl buckle frame fittings shall have the following information:
Q:Is there any requirement for the installation of the disc scaffold?
The same height of the building to be calculated separately, and ultimately is to pay attention to security, you can look at the yuan Tuo mall information on this aspect is still a lot of

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range