Steel Frame Formwork with High Standardized System

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

     1. Structure of Steel Frame Formwork GK120

        There is a prizing part designed in the corner, which can help to position and remove formwork easily.

        The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is             perfect.

       The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project            demand.


     2. Main Features of Steel Frame Formwork GK120   

      Light weight

      High strength

      High standardized system

     Easy connection with adjustable steel clamp

     Convenient and fast corner formwork

     Flexible to assemble and application


   3. Steel Frame Formwork GK120 Images

                         

 

      4. Steel Frame Formwork GK120 Specification

      -The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

     -The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

     -As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

     -The adjustable steel clamp is convenient to use, and can hold tightly.

    -There is a prizing part designed in the corner, which can help to position and remove formwork easily.

    -The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

   -The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

      5. FAQ of Steel Frame Formwork GK120

        1) What can we do for you? 

      .We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

      .We can provide you the professional design team.    

      .We can provide fashionable and newest styles for you.    

      .We can design the artwork for you.    

      . Please feel free to customize.  

 

     2) What promises can be done by us?

     . If interested in Steel Frame Formwork GK120, please feel free to write us for any QUOTE.

     . If printing required, please advise asap because the whole set need much more time to complete.

     . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

   3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Steel Frame Formwork GK120, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What types of building templates
This template has low price, flexible use, can be assembled into various shapes of the template structure, especially the structure of complex shape, suitable for a wide range of Engineering: second is framed plywood formwork system, the frame and rib small plywood formwork with steel frame for hot rolled flat steel, plate thickness is 6ram
Q:Main types of building templates
8, composite building template and its processing technology9, composite plastic building template (made of recycled plastics in accordance with the use of renewable resources)10, the improvement of the structure of the building with a combination of template 13, toughened glass combination of large formwork14, reinforced concrete component forming combination template15, steel frame plywood formwork16, the construction of light body template
Q:Steel frame wood fire doors can replace steel fire door
Can not, wood fire doors fire rating is relatively low, can not replace the steel fire doors
Q:The following is a two storey steel frame to be done on the top of the door 9 meters high
Not suitable for separate calculation, it is recommended to use the spatial model analysis. Such as MADIS, 3D3S
Q:Steel frame wood template defects
. Steel frame construction is not too good to get, but also because the wooden template is not easy to improve the compression capacity of the mold
Q:What are the principles of the layout and spacing of steel structure engineering framework
Column layout, consideration should be given to the structure under vertical load internal force distribution is reasonable, the intensity of each component can make full use of materials. At the same time, we should try our best to facilitate and speed up the construction progress and reduce the construction cost.
Q:Frame structure calculation of the material, the template area, and how to calculate the square
I do not quite understand this knowledge on the Internet to help you find some. See if you can use it
Q:What is the steel frame center support structure
The steel frame belongs to the steel structure, and belongs to the frame structure. According to the framework, the design and construction of steel structure
Q:ABAQUS steel frame modeling
Mesh structure, if the node is not enough, you can start from the InP file,Write your own model code.If there is no rules, only from the third party software,You Baidu under a lot of this
Q:Is the bamboo plywood and wood plywood the same?
Because of the high hardness of bamboo, with fixed drill drilling needs. Therefore, wood template is more simple and convenient. Hope to help you.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range