Product Description:

 

1. Structure of Steel Frame Formwork GK120

 

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

 

4. Steel Frame Formwork GK120 Specification

 

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

 Steel Frame Formwork GK120 with Qualified Materials for High-rise Buildings

 

 

5. FAQ of  Steel Frame Formwork GK120

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.  

2) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.    

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Single double scaffolding distinctionPlease list the sketch map
Single row of scaffolding is generally used for internal wall plastering, brush paint, and so do not need to bear the work of a single row of scaffolding need to hold the pole against the wallChinese now used in the steel pipe scaffold material made of steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. The materials and structures to proceed, and can be roughly divided as follows:Material division according to bar
Q:Bowl buckle scaffold can be used on any ground
This bowl buckle scaffold will be built more stable, reduce the probability of accidents
Q:He'd talk to all the people from his scaffold ~~~the laws were obsolete, a change they should demand~~~?
TWO HANGMEN!!! As I rode into Tombstone on my horse whose name was Mac I saw what I relate to you goin' on behind my back It seems the folks were up in arms a man now had to die For believin' things that didn't fit the laws they'd set aside The man's name was I'm a freak the best that I could see He was an executioner a hangman just like me I guess that he'd seen loopholes from working' with his rope He'd hung the wrong man many times so now he turned to hope He'd talk to all the people from his scaffold in the square He told them of the things he found; But they didn't seem to care He said the laws were obsolete, a change they should demand But the people only walked away, he couldn't understand The Marshall's name was Uncle Sam he said he'd right this wrong He'd make the hangman shut his mouth if it took him all year long He finally arrested Freak and then he sent for me To hang a fellow hangman from a fellow hangman's tree It didn't take them long to try him in their court of law He was guilty then of thinking a crime much worse than all They sentenced him to die so his seed of thought can't spread And infect the little children; that's what the law had said So the hanging' day came 'round and he walked up to the noose I pulled the lever but before he fell I cut him loose They called it all conspiracy and that I had to die So to close our mouths and kill our minds they hung us side by side And now there's two hangmen hangin' from a tree That don't bother me at all Two hangmen hangin' from a tree That don't bother me at all
Q:I want an industrial piercing?(Scaffolding)?
It can collapse your cartilage, if you get it done with a gun. If you go to a professional, and they do it with a needle, you'll be fine.
Q:I just got a scaffold piercing, Is there anything I can do to make it heal faster?
wats a scaafold peircing
Q:PHYS !!!A scaffold of mass 53 kg and length 6.5 m is supported in a?
Static Equilibrium: ΣTorques: 53g(3.5) + 80g(4.8) = T(6.5) {where T = ANS (a) (53)(9.8)(3.5) + (80)(9.8)(4.8) = 6.5T 1817.9 + 3763.2 = 6.5T 5581.1 = 6.5T T = 5581.1/6.5 = 859 N ANS (a) Total weight = (53 + 80)(9.8) = 1303 ANS (b) = 1303.4 - 858.6 = 444 n
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
To make sure the components are securely locked together and will not collapse when used.
Q:Should I work Offshore or Scaffold?
offshore for sure buddy,,scaffolding is a pain sometimes,,
Q:Bowl buckle scaffold steps can only be used in the number of meters 3
3 wall scaffolding = wall center line * wall height (outdoor natural floor to the top of the wall elevation)4 full scaffold = indoor clearance level projection area (not deducted with the wall stack, column, etc.)The 5 level of protection is calculated according to the horizontal projection area of the actual scaffolding plank
Q:why did the minister visit the scaffold at night?
Because of the guilt he was suffering from, he decided to hold a vigil (a long period of staying awake) at the scaffold where Hester was chastised from their sin. He does this hopeful for a remedy of the pain he has endured.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range