Steel Frame Formwork GK120 with Competitve Prices for Large Projects

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Steel Frame Formwork GK120

 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork GK120

 

  • High standardized system

  • Easy connection with adjustable steel clamp

  • Convenient and fast corner formwork

  • Flexible to assemble and application

 

 3. Steel Frame Formwork GK120 Images

 

 

Steel Frame Formwork GK120 with Competitve Prices for Large Projects

 

Steel Frame Formwork GK120 with Competitve Prices for Large Projects

 

 

4. Steel Frame Formwork GK120 Specification

 

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of  Steel Frame Formwork GK120

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

 3) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, 

     etc.by air/ sea, and we are VIP of these express.  

   .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7

    days.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Do Scaffold peircings hurt...? D:?
I think i have a pretty high pain tolerance and i thought it hurt. It wasn't terrible but it still hurt. It also is really sore after but maybe take some advil or something before and hope that may help. Good luck
Q:More than 3 floors of the building can be erected with bamboo scaffolding
Three storeys above the construction can not be erected with bamboo scaffolding, and now generally use metal scaffolding, metal scaffolding used in the most of the bowl buckle steel scaffolding.
Q:Scaffolding steel pipe, the number of fasteners?Small wall scaffolding, formwork scaffolding support, the number of steel pipe and fastener calculation,
You can simply think that 5 meters per square meter
Q:How do each of the scaffold scenes in the Scarlet letter have Puritan and Romantic ideaology??
the first is puritanistic because of public humiliation and romanic because pearl notices her father at such a young age. the second because they are together as a fam(puritans did not belive in individualism) and romantic because the stars make an A in the sky. the third because of public confession and dimmesdale dies
Q:Bowl buckle scaffold theory weight table who has, the distance is how much?
The main structure of the construction of the use of scaffolding scaffolding most of the scaffolding, the vertical pole of the scaffolding is generally 1.2~1.8m; transverse distance is generally 0.9~1.5m.
Q:Does getting a scaffold piercing hurt?
No good piercer (in the United States) would do an industrial/scaffold piercing on someone younger then 16 with parental consent. Any piercing (even lobes) is better done with a needle. The needle hurts less, is sterile (where a gun can't be sterilized), and the piercer has lots of experience and will use the right length of jewelry for YOUR anatomy. Mine didn't hurt much..the second hole was definately worse then the first though. It may be sore for months afterwords, they take a year to heal. The one I've had for 3 years still gets sore although it's fully healed.
Q:Is swelling in a scaffold piercing okay?
this is real, in spite of the undeniable fact that it is a good worse concept to have an commercial achieved with rings. this is by using the fact your physique can pass your piercings extremely, to handle the perspective that works maximum suitable on your physique. usually, that isn't a bad element, yet with industrials, this is a situation. you may discover that an commercial healed with rings would possibly no longer accommodate a bar properly; the piercing might heal unaligned, and donning a bar could be painful or impossible. Plus any save that thinks changing from rings to a bar at 6 to eight weeks will make any distinction from getting a bar initially, you mustn't have faith to poke needles in you. Industrials take 6 months to a year or extra to heal. At 8 weeks, the piercings are nevertheless very lots therapeutic. So in case you have your rings switched at that factor, you would be stressful the piercing, placing back therapeutic, and you will could manage each and all the rigidity and hypertrophic scarring issues besides. It in certainty comes right down to this, industrials suck to heal. Bars are difficult to heal. yet rings will often bring about undesirable commercial placement and alignment. in basic terms get pierced with a bar and manage the matters as they arrive. it is nevertheless very lots a danger to heal an commercial, it in basic terms takes time, persistence, and an exceedingly stable piercer (and prefer I reported come across a extra beneficial save, whoever advised you it would artwork to alter the jewellery from rings to a bar at 8 weeks is an fool).
Q:A 200-N scaffold is held up by a wire at each end.?
Lets call left wire T1, right = T2 T1 = (200 x 9) + (650 x 15) = 11550 11550 = 18T1 11550/18 = 641.67 N T2 = (200 x 9) + (650 x 3) = 3750 3750 = 18T2 3750/18 = 208.33 N left wire = 640 N; right wire = 210 N
Q:musical elements of March to the Scaffold by Hector Berlioz and Danse Macabre by Saint Saens?
I would suggest you take the score (any good music library should have it) and listen to the music. That would give you all the information you need. It doesn't take THAT long.
Q:Does it hurt when you get a scaffold piercing?
sure i could deliver it a five out of 10. good valued at it! For american citizens that do not recognise.... she is speaking approximately an business piercing it is known as a scaffold piercing within the UK.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range