• Steel Frame Formwork for High Building and Beam Construction System 1
  • Steel Frame Formwork for High Building and Beam Construction System 2
Steel Frame Formwork for High Building and Beam Construction

Steel Frame Formwork for High Building and Beam Construction

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
500000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Frame Formwork

 

Introduction:

CNBM 63 Steel Frame Formwork System is one kind of integrated construction formwork for concrete pouring. It could be assembled integrity to pouring the concrete of all the part of construction, saving the construction time and improving the quality of construction.

CNBM 63 Steel Frame Formwork System is very welcome in the word, we had export a lot, most is designed according to customers’ design drawing, we make sure the system is suitable for specific using.

 

Characters:

1.Simple structure: CNBM 63 Steel Frame Formwork System is mainly made up of steel frame formwork, sealing board, out corner, inner corner, tension bar, wedge, hook, steel pipe, timber beam and steel props. These simple parts could be assembled for wall, column, slab and beam in together.

2.Long life: the steel frame could be used no less than 200 times without damage, lot times turnover means cost saving.

3.Easy to assemble and disassemble: All the parts could be assembled and disassembled by hand with only a hammer.

4.Light weight: Compared with other steel frame formwork, 63 steel frame formwork system is very light, it could be moved by hand.

5.High quality of concrete: the smooth plywood panel makes the surface of the concrete very smooth.

 

 Type

Length*Width(mm)

L600

600*600

600*1200

600*3000

L950

950*600

950*1200

950*3000

L1200

1200*600

1200*1200

1200*3000

L1500

1500*600

1500*1200

1500*3000

 

Steel Frame Formwork for High Building and Beam Construction

Steel Frame Formwork for High Building and Beam Construction


Q:The whole concrete wall climbing frame or good use of steel scaffolding
Floor scaffold:Advantage:1) large bearing capacity. When the scaffolding geometry and structure comply with the relevant requirements, under normal circumstances, the bearing capacity of 15kN ~ 35kN of the single column scaffold (1.5tf ~ 3.5tf, design value).Clamp and Tube Scaffold2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What is an integrated climbing frame? What are the works? What are the advantages
The climbing frame, which is also called the lifting frame, can be divided into several types, such as hydraulic, electric, manual and so on. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction.
Q:Advantages and disadvantages of climbing frame and floor type scaffold
3, compared with the economy, the processing is simple, and the investment cost is low; if the geometric dimensions of the scaffold are carefully designed, and the utilization rate of the steel tube is improved, the material consumption can also obtain better economic effect. Fastener steel pipe frame equivalent to 15 square meters per square meter of construction steel.
Q:What are the maintenance and maintenance of hydraulic climbing formwork
After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
Climbing frame installation processInstallation of platform --- display base, installation guide, assembling components - horizontal truss beam with the bolt on the guide rail, the main frame vertical rod buckle on the beam - diagonal rod buckle on the vertical rod and beam - wall installation guide device, the frame structure of unloading with elevated body, the erection of scaffolding, the laying of the intermediate layer or temporary scaffolding and temporary building structure frame of pulling and hanging outside the dense mesh safety net - loaded third beams to guide seat -
Q:The difference between the scaffold and the scaffold
The climbing frame is the kind of iron that is assembled by a large construction site

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products