Steel Fram Formworks from China Market for Building Construction

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Steel Frame Formwork 

There is a prizing part designed in the corner, which can help to position and remove formwork easily.

The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

2. Main Features of Steel Frame Formwork 

Light weight

High strength

High standardized system

Easy connection with adjustable steel clamp

Convenient and fast corner formwork

Flexible to assemble and application

 

3. Steel Frame Formwork  Images


4. Steel Frame Formwork GK120 Specification

-The steel frame formwork is plywood covered with hollow steel. The plywood is 18 mm thick.

-The frame is highly strengthened, and the wall formwork can bear lateral pressure 60 KN/m2 while the column formwork can bear 80 KN/m2.

-As a standardized system, it is flexible to assemble , wood batten can be filled to satisfy the need f of non-standard size.

-The adjustable steel clamp is convenient to use, and can hold tightly.

-There is a prizing part designed in the corner, which can help to position and remove formwork easily.

-The plywood is screwed on from the back when connecting frame and plywood, so the surface of the finished concrete is perfect.

-The formwork series are a complete system with a full set of accessories, and can be set up flexibly according to project demand.

 

5. FAQ of Steel Frame Formwork GK120

1) What can we do for you? 

    .We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in Steel Frame Formwork GK120, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

    .Packing:  As Customer's Requirements

    .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Steel Frame Formwork GK120, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Main types of building templates
1, large steel wood (bamboo) combination template2, multi-functional concrete template3, leakage prevention building template4, multi-functional building block template5, housing construction templates and related methods6, composite building stereotypes template
Q:Frame structure calculation of the material, the template area, and how to calculate the square
(two) the construction of the deployment of 1 construction organization, according to the characteristics of this project, the company decided to set up a clever and capable project manager, construction team during the fight in the diversion project construction, and key projects included in the company's 2003 annual, as the focus to ensure in human, financial and material. The tree image, a brand, and always will be the quality, schedule, safety thread throughout the construction process, to ensure the realization of the goal. (1) the project decision-making level, composed of the project manager, deputy manager, technical director of the project exercise, organization, coordination, control, supervision and command functions. The project manager shall be entrusted by the legal representative, and shall be responsible for the execution and completion of the contents of the contract agreement signed by the company and the owner, in charge of the financial and personnel arrangements
Q:How much is the glass door with a frame
Titanium alloy frame tempered glass (8 mm glass), 480 yuan / square meter, artificial 60 yuan / square meter
Q:Steel frame wood fire doors can replace steel fire door
In our country, the fire door according to different materials, mainly wood fire doors and steel fire doors of two types, there are also fire doors steel wood fire doors and other material single use rarely, 99% of the market are wooden and steel fire door. As the name suggests, wood fire doors not only use wood as the frame material, but also fill with refractory material to make it a kind of flame retardant. The interior of the steel fire door is the same as that of the wooden fire door, but the door frame and the door leaf are made of steel plate.
Q:Steel frame 5 meters span to the extent of the H beam
Where is it located? You can learn about wind, snow, and earthquakes.
Q:What are the types of reinforced concrete bridge construction template
Types of reinforced concrete bridge construction template:1, wood template;2, combination steel template;
Q:100 tons of light steel frame steel structure connecting plate
The weight of the connecting plate generally accounts for 8% to 12% of the total weight!
Q:What are the principles of the layout and spacing of steel structure engineering framework
Frame column layout, to meet the requirements of the production process, to meet the construction requirements, the structure of plane stress is reasonable and convenient for construction of four aspects. The intersection of the pillars in building on the vertical and horizontal axis, in order to reduce the influence of the building use function column. The column is also associated with the beam span, column size can obtain a larger space, but will increase the beam column section size, should be combined with the construction needs and considering the cost of the structure.
Q:The steel frame structure of short column reinforced head after bending and shear module and embedded parts embedded anchor bolts. How to do
Do not understand。。。 I hope you understand our me.
Q:What is the steel frame center support structure
The steel frame belongs to the steel structure, and belongs to the frame structure. According to the framework, the design and construction of steel structure

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range