Steel Formwork Scaffolding System Formwork System with low price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 m.t
Supply Capability:
1000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Formwork Scaffolding System Formwork System with low price

Product pictures:

Steel Formwork Scaffolding System Formwork System with low price


Steel Formwork Scaffolding System Formwork System with low price

Steel Formwork Scaffolding System Formwork System with low price

Product description:

Name:

RingLock Scaffold System

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System:


(2)   Scaffolding Frame & Accessories:


(3)   Scaffolding Couplers/Clamps:


(4)   Formwork System Scaffolding & Accessories:


FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the bamboo board for the scaffolding of the building?
Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG Construction site commonly used scaffold with stamping steel foot Shouban.
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
The definition of project supervision responsibility is a longstanding problem that has long plagued the supervision industry
Q:scaffold on a tall office building.?
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:On the issue of compensation after the event of force majeure
The cleaning and repair costs of the works do not include scaffolding
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
Q:What is the most important safety hazard at the construction site?
2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
Q:What rights do I have as a tenant in regards to the scaffolding outside my window?
The scaffold is necesary, and already thre, and probably not coming down. I would think you have to LET the Land Lord give you a deal, and any decent LAnd Lord should respect wishes. You may have to move, but a deduction, possibly. Security, demand it ! Get the windows fixed, and if you are really unsure of the scaffold and window, get renters insurance, it's just twenty bux a month !. or buy a big DOG

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range