• Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price System 1
  • Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price System 2
  • Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price System 3
Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price

Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
100000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Steel Coupler Rebar Scaffolding Tube High Quality

1.Description of Steel Coupler Rebar Steel Tube Made in Jiangsu China Good Price:

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price

Steel Coupler Rebar Steel Tube Made in Tianjin China in Good Price

2.Advantages of Steel Coupler Rebar Steel Tube Made in Jiangsu China Good Price: 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Lesser on-site labour is required.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

Weather independent

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

On-Time Delivery

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Q:They can see a good place to anchor it but they won't start to build the scaffolding. I've used different builders and tried different bits of the paths, but its just not working. What do I do?
Hey love, I'll try to help but right now I'm pretty exhausted so it won't be my best. I am going to link a website that has tips and tricks, and hopefully you'll see something that fits. I hate when I get provided a link that doesn't though, so I also suggest posting to the forum on the website. Strategy guide may be a good place to start. They are all die hard fans, and always happy to help. I assure you your question will be answered very quickly once you sign up. I wish I could help more, but I was more of a VV2 player. If you don't get the help you need from the forum, edit and I will look when I am able to think. ;) Also, do you think it may be a glitch or just something your missing? If you emailed lastdayofwork, they might be able to suggest a patch if that's the issue. Good luck! :)
Q:i have my nose pierced and am thinking about getting a scaffold cartilage piercing, but am affraid because your cartilage is so tough! and i know it depends on the person when it comes to pain, but just compairing it to a nose piercing? (when i got my nose pierced i cried, but once they finished piercing it, i wasn't in anymore pain)
ive just had scaffolding done, and it was quite painful, far more painful than i was told. they just stab through your ear with a needle, but i didn't think it was that bad. not as bad as getting your nose done. but it was very sore and painful to touch for days after. hope this helps :) X
Q:Because my friend wants it done but isn't sure :)
probably 18. depends on your state. look it up or ask them.
Q:Scaffolding installation and precautions?
When the structural layer is attached to the wall, the wall column, the vertical horizontal rod and the transverse horizontal rod are set up immediately after the erection of the structure.5, closed with a step horizontal bar frame must turn around the hands all around the circle, with a right angle fastener and the inner and outer post fixed.6, the horizontal horizontal pole of the double row scaffold should not be greater than 100mm from the wall to the wall.7, when the scaffolding operation of the wall of the two steps, should take temporary stability measures, even after the wall pieces can be removed before the erection.
Q:hi guys i got my scaffold piercing a couple of days ago and it keeps bleeding on and off and there was dry blood but i removed it and its bleeding more what could i do step by step to keep total care of my piercing to get rid of all these problem please help it will really be appreciated
Dab it with tissue until it stops, Try not to play with it too much and if you need to touch it, ALWAYS wash your hands before doing so. Also do hot salt water soaks (as hot as you can stand) twice a day and it'll heal nicely in no time :)
Q:Which loads are considered in the design of the scaffold
1 the weight of the frame structure: including the vertical rod, vertical horizontal bar, horizontal horizontal bar, scissors, fasteners, etc.;2) structure, accessories weight: including the foot board, railings, foot boards, safety nets, such as the weight of protective facilities.
Q:i have lived in york for ten years and have been told many times that the minster in york has had scaffolding up for decades and that it has to stay there for political or religious reason there is never any work done or indeed workers on the scaffolding. can anyone shed any light on the matter for me or is it just an urban myth and nothing more than on going restoration.
York Minster Scaffolding
Q:Can anyone give a very brief description on all three scaffold scenes in The Scarlet Letter?
oh dang u have to read that story too ! man i had to read it and watch the movie ! so boring. What grade are u in ?
Q:scaffolding business?
scaffolding business would refer to building the business up in steps that are connected. A gradual increase, building up from what is already in place.
Q:What are the requirements for the sampling inspection of scaffolding?
1 the sampling proportion of various structural parts shall not be less than 5% and not less than 20 pieces, and the quality shall comply with the relevant standards and regulations. Not meet the quality requirements of the structural parts shall not be used.2 wall thickness of steel pipe should be in line with the provisions of the special construction program, and shall not be less than 2.8mm, the wall thickness of less than 2.8mm of the steel pipe shall not be used;3 is strictly prohibited the use of cracks, deformation of the fastener, the bolt appears to be replaced silk;4 foot hand frame accessories must be used before the anti-corrosion treatment.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords