Steel Coupler Rebar Steel Tube Made in Shanghai China in Good Price

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
6000 pc
Supply Capability:
300000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

1.Description of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality :

Lapped joints are not always an appropriate means of connecting rebar. The use of Steel Rebar Couplers can simplify the design and construction of reinforced concrete and reduce the amount of reinforcement required. 


The threaded steel coupler system is designed as a threaded reinforcement connection with 100% load transmission. The steel coupler rebar connection system is suitable for both static and dynamic load transmission in construction joints.


The coupler is designed as a threaded reinforcement connection for formed construction joints. Reinforcement work is normally carried out on both sides of the construction joint using lap joints or one side is anchored. The bar lengths are based on the structural analysis requirements of the building component and are calculated from anchorage and lap lengths.

Steel Coupler Rebar Steel Tube Made in Shanghai China in Good Price

Steel Coupler Rebar Steel Tube Made in Shanghai China in Good Price

2.Advantages of Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality : 

Advantages of Cut and Bend Services

Rebars are cut and bent to exact specifications, ensuring precision and consistency.

Cut and bend reinforcement bars do conform to BS 8666.

Material wastage is controlled and reduced.

Better utilisation of on-site space, logistics and reduction of inventory on-site.

In-house processes and procedures that ensure traceability down to the order level

The coupler system provides the opportunity to connect rebars quickly, easily and cost effectively, even when large rebar diameters are used. This makes the steel coupler rebar range a logical extension to our rebendable CNBM reinforcement continuity system for rebars over 12 mm.


3.Available sizes of Steel Coupler Rebar Steel Tube Made in Jiangsu China:

14mm,16mm,18mm,20mm,22mmm,25mm,28mm,32mm,36mm,40mm


4.Delivery:

Delivery Term: FOB / CFR / CIF available.

Delivery Time: 15 days or less after order confirmed.


5.Why choose us?

Technical Expertise

Experienced Management

Stringent Quality Control

Exemplary Service

Wide Product Range

Competitive Pricing

Huge branch network capable of catering worldwide


6.FAQ Steel Coupler Rebar Steel Tube Made in Shanghai China High Quality 

Why Us?

We are one of the Top 500 in the world, largest construction materials supplier in China. Also we are a state-owned company and respond to every customer with large and also small orders.

We own professional manufacturers with powerful producing capacity.

Extensive and comprehensive quality control system

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:What are the requirements for the sampling inspection of scaffolding?
1 the sampling proportion of various structural parts shall not be less than 5% and not less than 20 pieces, and the quality shall comply with the relevant standards and regulations. Not meet the quality requirements of the structural parts shall not be used.2 wall thickness of steel pipe should be in line with the provisions of the special construction program, and shall not be less than 2.8mm, the wall thickness of less than 2.8mm of the steel pipe shall not be used;3 is strictly prohibited the use of cracks, deformation of the fastener, the bolt appears to be replaced silk;4 foot hand frame accessories must be used before the anti-corrosion treatment.
Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price
Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
Q:Mobile scaffolding accessories prices
The price of each region is different, are you renting or buying?
Q:when do i change my scaffold piercing?
Hi :) You can change it after 4 months usually But sometimes it can take up to a year It depends on the person , everybody's body heals differently You should go back to your piercer and ask if it's healed enough to change the jewellery Yep , it's normal A scaffold piercing goes through the cartilage and cartilage piercings can take up to a year to fully heal :)
Q:Can I clean my scaffold piercing with my make-up wipes?
problematic problem. browse at search engines like google. this could help!
Q:Please help me in building professional people (scaffolding)
Door type scaffolding when used in general decoration, that thing is a direct product, a simple spell on the line, who rent who fightBowl buckle scaffold is also finished steel pipe, but there is no fastener, his fastener is a kind of fixed in the steel pipe instead of the demolition of the scaffolding is more convenient than ordinaryRent depends on the specific market
Q:The relevant provisions of the demolition of the external wall scaffold:
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range