• Steel Adjustable Shoring Screw Scaffold Base Jack Nut System 1
Steel Adjustable Shoring Screw Scaffold Base Jack Nut

Steel Adjustable Shoring Screw Scaffold Base Jack Nut

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details

Model Number:
adjustable support screw jack for construction
Type:
Steel Adjustable Scaffolding Shoring Screw Jack
Standard:
EN74,BS1139,CE or as your request
Brand:
ADTO
Paymet:
T/T L/C
Material:
Q235
Pipe dia:
form 30mm to 38mm(solid and hollow)
Test:
SGS, BV or as per your request
Rigid base plate:
6mm*150mm*150mm, 6mm*140mm*140mm
Our advantage:
great quality / best prices

Packaging & Delivery

Packaging Detail:packed in pallet, fits for sea shipment.
Delivery Detail:around 20 days upon receiving deposit or L/C

Specifications

Screw Scaffold Base Jack Nut
1.our own factory
2.durable and stable
3.Q235 material .SGS BV approved

We can MANUFACTURE all kinds of base jack with high quality with lower than market's price  

Regular size of the Base Jack

Name

Type

Size

Screw rod(mm)

Base Plate(mm)

Adjustable

Base Jack

Hollow

38 x 4 x 600

150 x 150 x 5

42 x 4 x 600

150 x 150 x 5

48 x 4 x 600

160 x 160 x 6

38 x 5 x 400

150 x 150 x 5

38 x 5 x 500

150 x 150 x 5

38 x 5 x 600

150 x 150 x 5

42 x 5 x 500

150 x 150 x 5

42 x 5 x 750

150 x 150 x 5

48 x 5 x 400

150 x 150 x 5

48 x 5 x 500

150 x 150 x 5

48 x 5 x 600

150 x 150 x 5

Adjustable

Base Jack

Solid

30 x 400

120 x 120 x 5

30 x 600

120 x 120 x 5

32 x 400

120 x 120 x 5

32 x 600

120 x 120 x 5

34 x 400

120 x 120 x 5

34 x 600

120 x 120 x 5

35 x 400

150 x 150 x 5

35 x 500

150 x 150 x 5

35 x 600

150 x 150 x 5

38 x 500

150 x 150 x 5

38 x 750

150 x 150 x 5

45 x 400

150 x 150 x 5

45 x 500

150 x 150 x 5

45 x 600

150 x 150 x 5

Adjustable

U Head

Solid

30 x 400

150 x 120 x 50 x 5

30 x 600

150 x 120 x 50 x 5

32 x 400

150 x 120 x 50 x 5

32 x 600

150 x 120 x 50 x 5

34 x 400

150 x 120 x 50 x 5

34 x 600

150 x 120 x 50 x 5


Q:I got my scaffolding approximately about 7 weeks ago maybe just a lil over, I want to know when is a good time to change the bar/take it out, I am keeping up with cleaning it 2 to 3 times a day with the saline solution, even though, it only requires to be cleaned 1-2 times a day to be fair though
9-12 months of healing time so 9-12 months until you change it. You should never change an unhealed piercing. Take it from someone who had to retire her industrial piercing from changing it too early, leave it alone until it is 100% healed.
Q:Room 29 meters outside the wall of the two rows of steel pipe scaffolding installation, demolition, joint protection measures in Wuhan, the price per square is how much money? A friend to help refer to Kazakhstan
With regard to the design and construction of floor type (double pole type) single and double row steel pipe scaffold for industrial and civil construction, and the design and construction of formwork support in the construction of horizontal concrete structure. National compulsory technical norms, because of its complexity, and you proposed "one square meter standard steel scaffolding the number of meters" is a vague and unclear description of the problem, considering the matter of security,
Q:Whats a scaffold in ac brotherhood?
Wrong category. Post under Video and Online Games.
Q:Latch type disc scaffolding accessories is a national patent product
Pankou scaffolding is a new scaffold, the products imported from Europe in the last century in 80s, is the product after bowl-scaffold upgrade
Q:I sincerely ask you to help me, door scaffolding, build 30 meters high, without any reinforcement points of the construction program. Thanks, high marks!
The height of the erection of the steel pipe scaffold shall not exceed the provisions of this specification 1.0.3.The design and construction of the 1.0.4 door type steel pipe scaffold shall comply with the relevant provisions of the state and the relevant mandatory standards.
Q:Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
Q:Which loads are considered in the design of the scaffold
1 the weight of the frame structure: including the vertical rod, vertical horizontal bar, horizontal horizontal bar, scissors, fasteners, etc.;2) structure, accessories weight: including the foot board, railings, foot boards, safety nets, such as the weight of protective facilities.
Q:Topic?Scaffolding construction program how to doSpecial construction scheme
Full support calculation method:1, determine the above line load (ie, the length of a variety of meters, take the maximum);2, to determine the bearing capacity of the foundation (through the strengthening of the bearing capacity);3, according to the bearing capacity of the foundation, about how many square meters per square meter to determine the vertical tube, assigned to specific point load;4, to determine the number of tons of vertical pipe can be per ton (according to pipe diameter, wall thickness calculation of allowable stress);
Q:hi, ive had my scaffolding for a little over a month now, and one of the holes has started going really weird. on the top, its swollen and sore on one side, and on the bottom, its the same but on the opposite side. not sure if its infected ir being rejected by ear, which ive heard can happen. i would like to keep it in if possible,as i love it. any help welcomed :) thanks xx
I've also had my scaffolding and I had the same issue. It was totally normal, I went back to the peircing place and asked if this was regular for the piercing. They said it was and to proceed with the cleaning process etc. they said it just has scabs because its healing :)
Q:Do the external wall decoration (from the top down to do) scaffolding is to wait until after the completion of the indoor and outdoor decoration before the demolition?If the first interior decoration, can make a layer of a layer of it is to remove all the work finished I mean I finished all the interior decoration, wall decoration only, then I do a wall decoration on the demolition of a layer of scaffolding, this site useful no
The relevant provisions of the demolition of the external wall scaffold:First, the removal of scaffolding before the accurate preparation work should meet the following requirements:1, should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system, etc. are in line with the requirements of the structure;2, should be based on the results of the inspection to improve the construction organization design of the demolition order and measures, approved by the competent authorities before the implementation;3, should remove the scaffolding on the debris and ground obstacles.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords