Product Description:

Stationary Scissor Lift Platform

 

Model

SJG3-7

Lifting height

7m

Table size

2.55*1.4m

Capacity 

3000kg

Cylinders

φ90*4

Closed height

1150mm

Main material

160*80*6mm steel tubes

Upper frame

140*60*5mm U steel 

Platform thickness

 4mm

Pump station

4KW/380v/ 50HZ

Weight 

3000kg

Handrail height

900mm

Guide rails

120*50*5mm;    2pcs;

Lifting speed

5-7m/min

Structure 

Five scissor layers

Delivery 

10days

Spare parts

seal ring and oil pipes

Warranty 

One year

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What can be done when the hydraulic platform is down?
You can't see your schematic diagram, theoretically do not use hydraulic lock, should balance valve, the frequent switch of hydraulic lock causes jitter and unstable. Shunt valve, speed regulating valve or pressure compensating valve is a common solution to solve synchronization problem. Synchronous diverters are expensive
Q:How to use the elevator to be safer and more efficient
Monthly check Roller, shaft and bearing, oil cylinder pin shaft and bearing, arm hinge shaft and bearing, etc. All parts should be filled with lubricating oil to extend the life of the bearing. Oil and oil level of hydraulic oil. The platform rises all the way up, and in this position, the hydraulic pressure should be 40 to 50 mm above the bottom of the box. The hydraulic oil is dark, sticky or gravel, etc. If found, it should be replaced in time (32 # hydraulic oil).
Q:The tomb raider was not able to pry the gear in order
Press the switch and then descend the elevator down to the second floor and then climb to the right hand side of the cargo and pull down the first gear. Walk to the elevator and climb down the stairs to open the door between the second and third floors. Go up to the third floor and turn the elevator to the third floor. And then you go back to the second floor and you go to the third floor and you go to the sandwich and you get the second gear. Go up to the fourth floor and press the elevator up, go back to the third floor and switch to the three or four floors and twist the third gear. Come down to the entrance of the third floor elevator and then go in and use a shotgun to smash the three floors and the four floors. On the fourth floor elevator again back to the fourth floor, between the back to the fourth floor on the elevator by just open the channel on the wall opposite the detour to the fourth floor mezzanine dropped last gear lever.
Q:How to use the ball screw platform?
Second, heyman screw can see lu, platform settled on first use, carefully to see if there are any more abnormal hydraulic parts, electrical appliances, layout, to ensure that no more than about geomagnetic held before commissioning, no-load again after 3 ~ 5 times a load test.
Q:The characteristic of shear fork platform
Shear fork lift platform is mainly used in the logistics industry, production lines, lifting, loading and unloading goods to floor between basement, can also be used to lift stage, lifting work station, etc. The product has a stable structure, low failure rate, reliable operation, safe and efficient and easy to maintain.
Q:The principle of hydraulic platform is controlled by foot switch
There is a very commonly used in oil overflow valve, its role is: regardless of the flow of oil, only to a certain pressure to open (internal spring, spring elastic adjustable), also have the effect of pressure.
Q:What standard elevator platform needs to go to the special equipment inspection to report
(the state council of the People's Republic of China on March 11, 2003 to no. 373 Based on January 24, 2009 the state council on amending the decision of the < > special equipment safety supervision regulations "amendment)
Q:What device is better to design a platform that is 1 square meter or so?
Elevating elevator, lifting platform, four-wheel mobile elevator, aluminium alloy lift, fixed lift, rail lift, truck lift
Q:Where is the mobile lift platform?
It is. The beijing-shanghai railway, the beijing-shanghai expressway, the beijing-shanghai expressway, the qingyin high speed, the ziqing highway across the north and south, is close at hand. Favorable geographical location and convenient traffic bring sufficient conditions for the development of the company. Shengze technical force is strong, the process flow is advanced and reasonable, the detection method is complete. The company's products have the advantages of novel design, reasonable structure, stable lift, safe load, simple operation and convenient maintenance. Products are widely used in various industry, such as industrial and mining enterprises, production lines, railway, airport, dock, station, cargo handling, warehousing logistics, high lift, plant site equipment installation, etc.
Q:There is no easy way to push the goods when the platform is loaded.
There are several rollers or balls on the workbench that can move from above, not knowing what you are doing. If necessary, a friend can leave a message.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range