• Stationary Scissor Lift Platform System 1
  • Stationary Scissor Lift Platform System 2
  • Stationary Scissor Lift Platform System 3
  • Stationary Scissor Lift Platform System 4
Stationary Scissor Lift Platform

Stationary Scissor Lift Platform

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Stationary scissor lift platforms are widely used machines for many fields, the most popular using are in warehouse,basement, first floor,etc, which for carrying the cargos,cars and so on to the high floors.

It is design and produce as clients' requirements, as long as telling us the requirements of capacity, platform size, lifting height, we can design, supply drawing and give offer.

 

Model  

Table size(m)

Capacity

Close height 

Lift height 

Power supply

SJG2-5

1.75*1.2

2T

1.03m

5m

380V/50HZ

SJG5-3

*2

5T

0.8m

3m

380V/50HZ

SJG1.5-4

2.5x1.5

1.5T

1.0m

4m

380V/50HZ

SJG4-4.4

*1

4T

1.1m

4.4m

220V/60HZ

SJG2-11

5.5 *2.2 

2T

1.2m

11m

5.5KW/380V

SJG1.5-4

1.8 *2

1.5T

0.86m

4m

4KW/380V

SJG0.7-0.95

0.95*0.8

0.7T

0.4m

0.95m

2.2KW/380V

SJG0.2-2.3

1.3*1.0

0.2T

0.48m

2.3m

2.2KW/380V

SJG3-2.3

1.6*1.4

3T

0.66m

2.3m

2.2KW/380V

SJG1-5

1.6*1.5

1T

0.92m

5m

2.2KW/380V

SJG2-6

2.0*2.0

2T

1.03m

6m

4KW/380V

SJG2-5

2.1*1.2

2T

0.87m

5m

4KW/380V

SJG3-6.5

2.2*1.9

3T

1.52m

6.5m

5.5KW/380V

SJG2-5

2.3*1.4

2T

0.87m

5m

4KW/380V

SJG2-5.15

2.3*1.44

2T

0.87m

5.15m

4KW/380V

SJG2-4

2.5*1.5

2T

0.86m

4m

4KW/380V

SJG2-4

2.5*1.5

2T

0.86m

4m

4KW/380V

SJG2-9

2.5*2.0

2T

1.43m

7.5m

4KW/380V

SJG1.5-7.9

2.6*2.0

1.5T

1.2m

7.9m

4KW/380V

SJG2-5.4

2.9*2.0

2T

0.82m

5.4m

4KW/380V

SJG2-4

3.0*1.6

2T

0.83m

4m

4KW/380V

SJG2-4.5

3.0*2.5

2T

0.82m

4.5m

3KW/380V

SJG3-4.5

4.3*2.8

3T

1.03m

3m

5.5KW/380V

SJG1.5-8.5

2.25 *1.6

1.5T

1.2m

8.5m

4KW/380V

…….

………..

……..

………..

……….

…………..

 

Q:The advantages and disadvantages of using diesel engine as an engine
The fuel consumption is significantly lower than the steam engine power plant. Economical and practical, diesel fuel is low in the same kind of fuel, so it is easy to accept.
Q:What happens when the platform comes up and the power goes out.
The electromagnetic valve core can be artificially pushed back.I hope my answer will help you
Q:What should the chain's main elevator be aware of when installing the chain
Based on many years of production installation experience, the following items should be noted in the installation: The rail type carries mesa thickness problem. According to the actual demand, adopt the most appropriate bearing mesa, some manufacturers in order to save costs by steel plate thickness is not appropriate, causing customers to use after a period of time, serious deformation mesa.
Q:How to improve the oil leakage line
The line itself I think should be no problem, I don't know where your oil spill is. I think it's an interface leak, Or a hydraulic cylinder leak, And is your job stress reasonable? Is it too stressed?
Q:What is the main shaft of the horizontal milling machine
A kind of widely used machine tools, can be processed on milling machine plane (horizontal, vertical plane) and groove (key, T slot, dovetail groove, etc.), tooth parts (gear, spline shaft, wheel lovely, spiral surface (screw, screw groove), and various surface. In addition, can also be used for the surface of solid of revolution, inner hole machining and cutting work. Milling machine at work, workpiece loading on the worktable or dividing the first attachment, cutter rotating movement, accompanied by a table or milling head feed movement, the workpiece can obtain the required processing surface. Because the cutter is intermittent, and high productivity of milling machine
Q:There is no easy way to push the goods when the platform is loaded.
There are several rollers or balls on the workbench that can move from above, not knowing what you are doing. If necessary, a friend can leave a message.
Q:Operation and attention of electric elevating platform car?
Non-professional personnel shall not adjust the overflow valve, the hydraulic system of each component is within the prescribed work under pressure, adjust the overflow valve, may lead to abnormal operation of hydraulic system. There are unnecessary injuries to people, machines and objects; Before any part of the hydraulic system, the pressure oil should be discharged before the pressure oil gusts out. E, the corresponding moving parts shall add some lubricating oil to extend the life of the bearing. F, check the oil and oil position of hydraulic oil. The platform rises all the way. In this position, the hydraulic oil should be 40-50mm above the bottom of the box. If the hydraulic press is dark, sticky or gravel, it is found that 120 # hydraulic oil should be replaced in time.
Q:How do you remove the horizontal universal elevator milling cutter
Remove the milling cutter in a horizontal milling machine, and if you hammer it with a hammer, it is easy to break the knife and not be allowed to operate. The correct way to do this is to use both hands to pull the milling cutter out of the shaft, and when it's too tight, you can use a hammer to gently tap around the milling cutter.
Q:When the hydraulic platform drops, it feels very shaken and unbalanced. Please answer?
Can you adjust the flow rate to slow down the same amount of pressure and the decrease is much faster than the increase. This does not know that the valve is connected to the solenoid valve, which may be the overflow valve or the balance valve The oil tank has no refueling mouth and oil outlet?
Q:What standard elevator platform needs to go to the special equipment inspection to report
Hoisting machinery, it is to point to used for vertical lifting or vertical and horizontal moving heavy mechanical and electrical equipment, its range is rated lifting weight greater than or equal to 0.5 t elevator; The weight is greater than or equal to 1t, and the lifting height is greater than or equal to 2m crane and weight bearing form fixed electric gourd

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords