Standard Scaffolding Scaffolding system Frame System Scaffolding

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
4 m.t.
Supply Capability:
1000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Standard Scaffolding Scaffolding system Frame System Scaffolding


Product Description:

1).Frame system scaffolding is light duty,easy to erect and walk through,wide appciations for both inside and outside constructions.

2).A complete set of  frame system scaffolding  usually include 2 pcs of H frames ,2 pairs of cross braces and 4 pcs of joint pins.

3).Frame system scaffolding  is for inside concrete supporting which can be used with the U Jack to supporting the concrete slab.

4).Frame system scaffolding  is also a type of mobile scaffolding that you can install caster wheels at the bottom of frame scaffold ,then frame scaffolding can be moved here and there .

5).Frame system scaffolding   can be used for the building decoration which is the light duty scaffolding,it is more easier for moving.

6).Frame system scaffoldingare dip painted which means that the inside of the frame scaffolding can be painted to against anti-rustiness


Advantages:

1.Steel-frame scaffolding

2.Swivel 8 inch caster with brakes

3.Adjustable

4.Fold easily for storage


Standard Scaffolding Scaffolding system Frame System Scaffolding

Standard Scaffolding Scaffolding system Frame System Scaffolding

Standard Scaffolding Scaffolding system Frame System Scaffolding

Standard Scaffolding Scaffolding system Frame System Scaffolding


 

Use: 

Presented like a shape of door,Frame-connected Scaffolding includes main frame,horizontal frame,cross brace,stage board and adjustable base. In order to display frame with coupler system enough, good performance of stability, firm structure of the whole, easy and fast to assemble and dismantle without any tools,safe working at height especially, and it is ideal material for construction engineering.

 

Material: 

Q235 Q345


Finishing: 

1.Hot dip galvanized 

2.painted

 

FAQ:

What can we do for you?

    We can ensure the quality of the vinyl banner and avoid extra expenses for customers.   

    We can provide you the professional design team.   

    We can provide fashionable and newest styles for you.   

    We can design the artwork for you.   

    Please feel free to customize. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
In order to prevent the occurrence of production safety accidents at the construction site, improve the emergency working mechanism, in the event of the accident occurred in the project, the rapid and orderly emergency rescue work to carry out the accident, rescue the rescue project, the construction of the project site safety accident emergency plan The wounded, reduce the loss of the accident, the development of this plan
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 3?
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:On the issue of compensation after the event of force majeure
If the rain will be the construction of the road also washed away, then the road and repair costs borne by the owners There is a principle, "who is the child who is going," the engineering entity itself is the owner of this needless to say; the scene of the material is also the owner of the stack; the road would have been "seven links and one leveling" content, ; Required engineers to stay in the construction site necessary management and security personnel are owners of the requirements of the engineers, should belong to the owners But scaffolding is a technical measure, you should bear Such a look, is not clear how much ah
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Seeking construction machinery safety supervision papers can be greater than 100 words
Q:A 54.5 kg painter is on a uniform 23.0 kg scaffold supported from above by ropes .?
I am looking for as shown, as I am not psychic.
Q:How to do a good job in typhoon prevention work in rural areas?
Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
Q:At the scaffold, Dimmesdale sees 3 people before Hester and Pearl. Who are they, what do they represent?Help!?
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range