Product Description:

Stair Tower

The structure of ring-lock stair tower is the same as Φ60 ring lock scaffolding.

The dimension of cross section is 1500×3000mm.It is widely used in construction.


Bearing Capacity of Stair Tower:

The stair tower can be erected with the maximum height of 150m,

when attached to the wall every 4.5m.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are some of the components of the combined steel template, what role?
3, the connector has a U shaped card L - shaped bolt, hook head bolts, fastening bolts, pull bolt, dish shaped fasteners, 3 - shaped fasteners, such as plate type pull rod.4, support tools supporting steel pile, steel column, steel column hoop, hoop steel, steel beam, steel pipe clamp fixture pillar (supporting), steel brace. Planar adjustable steel frame, wood, etc..5, the isolation agent commonly used waste oil and diesel oil (1:1 ~ 4) and silicone co hydrolysate and gasoline (1:10), etc.
Q:Plastic building template? How is the effect? What are the advantages and disadvantages?
Plastic construction formwork turnover number can reach more than 30 times, but also recycling. The temperature range is large, the specification is strong, can be seen, drill, easy to use. The smoothness and smoothness of the surface of the template exceed the technical requirements of the existing clear water concrete formwork, and the utility model has the functions of fire resistance, corrosion resistance, water resistance and chemical corrosion resistance. Can meet the demands of building formwork of various cuboids and cubes, L shape, U shape requirements
Q:What is the 86 series steel formwork
Steel template (also called undismantled Mould Network) can replace the wood template, significantly reduced usually with wood, plywood, steel plate or other traditional sealing template on the pore water pressure and the pressure in the bubble concrete elimination; steel template (undismantled Mould Network) structure of concrete casting, forming an ideal rough interface. Do not need to rough cutting operations can enter the next construction processThe utility model can be placed before installing the reinforcing steel bar, and can also be placed after installing the reinforcing steel bar. If it is installed before the installation of steel, easy installation and easy to install; concrete pouring process can be visually monitored, thereby reducing the risk of the emergence of pores and honeycomb structure and other phenomena.
Q:What is the standard thickness of steel formwork
Pellicle is down; if there is no pellicle, there is a line below, the light on one side
Q:On the problem of precast box girder formwork
I am specialized in Civil Engineering (design and construction), you see the drawings are box girder template for the design of template
Q:Types of building templates? What is clear water template?
Wood plywood (water templates): currently widely used in the solid wood plywood formwork, should promote the use of wood covered plywood. Commonly used in Guangdong area of Eucalyptus wood membrane.
Q:Types of building templates? What is the clear water template
2 steel template: in addition to the combination of steel templates, has developed a wide steel template, all steel large formwork, light large steel mold, steel frame, such as 63 steel template. The high cost of steel mold, in addition to large projects such as bridges or other buildings, nuclear power plants, reservoirs and other construction sites, has been replaced by building wooden template.
Q:What are the features of the new building template?
No need to be used again after the molding process. The periphery of the template with plate fixation, and a groove can be inserted, the template is extended.
Q:The first layer is higher than the standard layer height, the big template according to the standard layer
Position of horizontal construction joint of shear wall. The first layer is higher than the standard layer height
Q:I would like to ask the bridge column (D110) steel template thickness should be how much
Parting is generally divided according to the release of simple or rounded way, according to the height of the construction plans and schedule requirements. Generally, the height of the column template is set at 1.52 or 0 5m in order to be easy to use.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range