• Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM System 1
  • Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM System 2
  • Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM System 3
Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM

Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

  • Quick Details of Stair Case 450*1829*1955*2677 Step Ladder with Hook

  • Material :Q235/Q345 carbon steel

  • Surface treatment :Hot dip galvanized,Pre- galvanized

  • Main Components :steel with hook

  • Diameter :450*1829*1955*2677

  • Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM

  • Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM

  • Stair Case 450*1829*1955*2677 Step Ladder with Hook CNBM



  • Descriptions of Stair Case 450*1829*1955*2677 Step Ladder with Hook

  • Step ladder with hook is an independent research construction ladder based on market needs. Its distinctive hook design, which is convenient and firm, makes safe construction work possible. The punched holes in galvanized steps enable a well drainage and corrosion & skid prevention. In combination with scaffolding structure, the step ladder with hook is convenient、safe and functional construction equipment can be used in any weather condition.

  • Advanced CO2 shielding gas welding design,assuring construction safety.

  • Well drainage and anti-skip step guarantee a safe platform work.

  • Standard step ladder, a necessary & fast construction equipment for scaffolding structure.

  • Galvanized treatment design, Independent research, cost control excellent product.

  • Energy-saving and environment-friendly.



FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:I really want to get one done and I would like it if someone could tell me how badly does it really hurt? During and after. I know everybody has different pain thresholds but on average? I'm just nervous to get it done but really want another piercing on my ears. I have my lobes and a cartilage on my right ear. How easy is it to clean? rate in numbers as well as a description. Thanks.
Well of course it depends on the person. Some people say the piercing isn't bad at all, while some say it is really painful. Some people say the healing process is absolute hell, but for some people it's a breeze. I got an industrial 3 months ago, and i would rate the actual piercing process as a 8/10 (10 being the most painful). It was pretty painful in my opinion, but the good thing is that the pain doesn't last long at all. Most people i know who have industrials say that the healing process is more painful than getting the piercing, but for me it was the complete opposite. Immediately after the piercing it throbbed and was a tiny bit sore for about an hour, then for the next 2 days it was completely painless. But after that, it was pretty sore for about 2-3 weeks, but it wasn't that bad. Now after having it 3 months, it still feels a bit uncomfortable when i sleep on it, sometimes it's a tad bit sore, but no big deal at all :)
Q:Where can I source scaffolding steel/aluminium planks with rubber end caps?I am having much difficultly finding anything, can you assist?Thank you in advance.
Maybe something like a window washers scafolding planks...?
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
The general price of 3800-4200 yuan per ton, you need to see the material and specifications.1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-
Q:I plan to have a scaffolding or industrial piercing soon, but don't know where to go.Any suggestions and could you include the prices?x
Cost depends on the studio. It ranges from 20 to 45 pounds for each piercing, most common price is 25 pounds for each piercing, high quality titanium or stainless steel jewelry included. The industrial is 2 piercings in one so : 25 + 25 = 50 pounds, jewelry included.
Q:Introduction of external scaffolding
2 the size and surface quality of steel pipe shall meet the following requirements:1) the new steel pipe should have quality certificate, quality inspection report; steel surface should be flat and smooth, no cracks, scarring, delamination, dislocation, bend, burr, indentation and scratch depth of steel pipe; allowable deviation table item allowable deviation inspection tool 1 welded steel pipe size (mm) diameter 48 wall 3.5 -0.5 thick 2 vernier caliper at two ends of the steel tube shear diagonal deviation 1.7 corner ruler feeler, the outer surface of the steel pipe 3 corrosion depth is less than or equal to 0.50 bar 4 vernier caliper end bend L = 1.5m = 5, 5 pole bending steel ruler 3m<l = 4m4m<l = 6.5m = 12 = 206 level bar, inclined bar bending steel pipe L = 6.5m = 302) from drilling pipe.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
Construction preparation1, materialThe steel pipe diameter is 48 or 51mm, wall thickness is 3 ~ 3 5mm or hot-rolled seamless pipe joints, used as the main column, a large bar, a small bar, inclined support.The connecting member: rotary buckle, square buckle, buckle, docking barge core.The base made of phi 40 steel tubes and 4 ~ 5mm steel, used for main column stepping. The floor area of the base should not be less than 200C.
Q:In the Scarlet Letter, when Dimmesdale asks Hester who Chillingworth really is, why does she keep her oath to him of not revealing that he is her husband? Guilt? Morals? Thanks
Because she owes him since she cheated on him.
Q:what is the height of a scaffold if the person is 6ft tall?
Whatever they set it at. It could be 1 foot, 4 feet, or 20 feet. How tall a person is, is irrelevant.
Q:improper design of formwork and scaffolding, not adequate braces and supports, improper handling, corrosion of material is several factor of formwork and scaffolding failure. it is estimated that more than 3000 accidents involving falls from scaffolds and 30 fatalities
Well, it seems you came close to answering your question. But are falls a scaffolding failure? For me failure means that the scaffolding sagged or fell - which may result in injuries with or without falling as when the failing scaffolding falls on a worker on the ground. I would think that major causes of failure as I defined it would be inadequate or failed attachments to the building and failure of ground support for the structure. Question needs to be improved to define what you need in answer and avoid conflict between question and detail.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords