stainless steel heavy duty pipe clamp

Ref Price:
$0.03 / pc
Loading Port:
Qingdao
Payment Terms:
TT LC
Min Order Qty:
100 pcs pc
Supply Capability:
300000pcs Per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Usage: Pipe Clamp
Material: steel、matel;Galvanized iron ,stainles
Band width:3mm/20mm
Connection:welding
Model number:As your requirement
Structure:Swivel clamp
Certificate:ISO9001:2008
Feature:
1.Use the open internal and external circle structure,and with screw fixed.It is effectively to solve the problem that when small diameter solft tube connect the hared tube,it is easy appear dead angle,and liquid or gas leakage problem.Easy structure,Easy maked.
2.Edge is no burrfree,it is ability to prevent the tube damaged
3.By a efficiently hydrogen relief treatment,long-term use needn't to worry fracture and other problems
Surface: zinc plated Packaging
4.Accord with DIN3017 Standard.By 48 hours salt and fog test,it has a good corrosion resistance
5.By our last 48 hours elastic test,to insure a high strength mechanical properties.
6.Easy to fix.
Working Temp: -40 ℃ ~ 110 ℃
Size:3/8" 1/2" 3/4" 1" 1 1/4" 1 1/2" 2" 2 1/2
Structure: Suspension Clamp and so on On-time shipment and pre-shipment product quality safeguards clamp is mainly used in automobiles,tractors, ships, gasoline engine, and so on each kind of mechanical
device for oil, gas, hydraulic hose connector, various types of
rubber tube interface must join parts fastening.
Detail: plywood case ,pallets or any other package as buyer's requirements
Delivery Detail: about 20-30days

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why can't the clamp gauge measure the voltage and frequency?
Band frequency may be the reason for increasing the cost and the market is limited. The theory is all right.
Q:Use clamp ammeters, wire requirements will be placed in the window center. Why is this?
In the use of clamp ammeters before should carefully read the manual to find out AC or AC / DC clamp meter.
Q:The multimeter, megohmmeters and use clamp meter.
Preparation prior to use1, check whether the European watch can work properly, place the watch horizontally, and empty the handle of the euro watch. The pointer should point to. O, and then slowly shake the handle, so that L and E two terminal pile output line instantaneous short, the pointer should quickly point to zero. Note that the L and E cannot be shorted too long when shaking the handle, otherwise it will damage the watch. ,2, check the electrical equipment and circuit being tested to see if all the power has been cut off. Never allow equipment and lines to be charged with a European watch.3, before measuring, deal with equipment and line the first discharge capacitor discharge equipment or line so as not to endanger the personal safety and damage megohmmeters, it can reduce the measurement error at the same time, attention will be the test point to wipe clean.
Q:A fire was found with a ground electricity? Stealing electricity.
To do so is very dangerous, prone to accidents, in case the public grounding wire grounding resistance is large, it will cause the water running electricity, indirectly causing electrocution, death accident, that would be troublesome
Q:I would like to ask the relationship between the power of the water pump motor and the flow of water
The water flow is proportional to the pressure (the pipe diameter is constant), and the pressure is used to control the frequency converter for convenience and automation.
Q:How do I add refrigerant to the wall mounted air conditioner?
You can not add it yourself, usually outside the repair workers, plus, and to the pressure gauge, clamp type table, capillary. General 1. 5 to 2 Pijia fluoride price of one hundred to one hundred and fifty range
Q:Generator carbon brush sparks, how to deal with?
From the following points: 1. check out whether the brush length is too short to cause the lifeline, the pressure is too small not brush contact ring; 2. check the spring pressure pressure is appropriate, if too small will lead to jump 3. check slip ring brush discharge; surface finish, if too much hair will increase the brush contact resistance of spark; 4. check the rotor electrical resistance, ensure the normal, no inter turn short; 5. check whether the oil bearing gap is too large, resulting in rotor slip ring brush runout, radial runout check slip surface is too large. The brush spark causes sparks; 6., whether the brush is the same as before, the brush has a requirement for the conductive current and the friction speed.
Q:Current detection small current
The detection of small current is usually measured in series with a ammeter. Alternating current is measured by an alternating current (AC) ammeter, and the direct current is measured with a DC (DC) ammeter,
Q:Methods use a table clamp type table and the matters needing attention
The measurement in high voltage loop, prohibit the use of lead from the clamp ammeters another meter measurement. When measuring the phase current of high voltage cable, the distance between the cable head and line should be above 300mm, and the insulation is good, which can be carried out when the measurement is convenient.
Q:30mA leakage breaker trip home is always with what method to find the leakage point, with clamp ammeters how?
Check the leakage with shaking table or pointer multimeter 10K resistor file. In the case of power failure, the insulation resistance between the fire line and the ground wire of each branch is measured. When there is leakage, the meter will indicate a relatively small resistance value and the insulation will indicate infinity.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range