Stainless Steel Flange

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
1 Ton pc
Supply Capability:
100 Tons per Month pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


stainless steel flange 

1. We can supply good quality and good price flanges.

2. Fast delivery time and perfect design.

3. Good service.

 

Features of stainless steel flange

1) Stainless steel flange and carbon steel flange


2) Standard  ANSI, JIS,  DIN, UNI, BS, AS .GOST..EH


3) Material A105,A350LF2,A694,GRADE F52 60 65 70,S235JRG2,C22.8,ST37.2,SS400,S20C,Q235,20Mn,16Mn,20# A182 F304 F316 F317 F321 F51 F53,DIN1.4571 1.4301 A182F1 F5 F9 F11 F22 ECT.


4) Production with anneal solution for stainless performance


5) Special design available

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can the pneumatic pipe connection be carried through the water?
Yes, but it will leak. Or do you need a special pipe joint?
Q:Screw in pipe joint Dg10 what do you mean?
Dg is the standard name, DN, is called Dg=DN, in standard GB, GB, Dg, DN are mm (mm), "Dg DN, the name is called" nominal diameter ", can be processed R 1/4" external tapered threadThe diameter of the pipe can be divided into outer diameter, inner diameter and nominal diameter.
Q:PVC pipe joint leakage how to do?
Solution of water leakage in sewer pipe:1, if the water is PVC, will be able to buy a PVC pipe to pick, put the tube cut broken, the first set of interface end into the pipe, the other end of the cut position coincides with a hole in the interface of Qi Ping, making it just to straighten. Then send directly to this end, the two ends have a certain cross then distance (length) and then put it down, with lateral water pipes and the two in the PVC at both ends of the inner side direct glue.2, you can buy waterproof tape to repair the water pipe, it is entangled with the line, and then mortar, waterproof agent and cement on it.3, can not handle, it is better to find a professional company.
Q:Do you need adhesive for the sleeve joint of PVC wire pipe?
In my more than 10 years experience, in the piping, pipe joints such as glue, threading, threading device is easy to pass through the pipe joints, straight through and so on. Although the specification is to use glue, but the operation is very troublesome, I generally do not, no one to check you with no glue, just use the line tube inserted into the pipe joints or through the end can glue, threader easily through these joints. The line pipe is not easily disengaged and flooded when it is on the ground
Q:Consult the problem of the pressure at the entrance and exit of the pipe joint
The oil outlet is 2MPa, too,The relation between the pressure at the outlet and what you call the inlet pressure is as follows:
Q:Air conditioning pipe joints how to remove, the joint is ring, there are similar to the spring on the oil seal
Tools, inside six corners, wrenches, screwdrivers.1, fluoride start cooling, compressor work closed high pressure valve, run for one minute, close the low-pressure valve, stop. Unplug the power plug (remember).
Q:What is the manual pre assembly procedure for the EO-2 joint?
I. pre assembled1, EMB card sleeve type pipe joint pre assembly of the most important link, directly affect the sealing reliability. A dedicated preprocessor is usually required. The small diameter can be pre joint in a vise. The concrete method is to use a joint as the mother's body and press the nut and the sleeve onto the tube. The utility model mainly comprises a sleeve type through pipe joint, a clamping sleeve type end through connection head, a clamping sleeve type three way pipe joint and other patterns. I found that even if the same manufacturer of a batch of goods, the cone of these joints on the depth of the hole is often different, resulting in a leak, and this problem is often neglected. The correct approach is to connect the end of the pipe with what kind of joint, and the corresponding connection ends are prefabricated with the same type of joint, so that the leakage problem can be avoided to the maximum extent.
Q:Maintenance skills of fire hose clamp joint leakage
The best approach is to remove the clamp groove on the inner wall of the groove, cut a layer of 3mm thick rubber (or thin rubber inner tube), the inner wall of the groove width is smaller than the width of about 2~3mm, their good after the clamp bolt is good, no Water Leakage the problem.
Q:PVC can the pipe joint be butted with the joint? How do I get it?
For example: 110mm diameter PVC pipe joint two, to connect them, you can cut a 110PVC tube (length 8cm), at the end of a first pipe with special glue inserted into a connector, then put another head on glue, then inserted into another joint, so ok.
Q:Plastic pipe joint leakage, how to deal with better?
You said that the plastic pipe is not PPR tube, if the tube also need to cut in Water Leakage, buy a direct, but the use of the tools is not the same, this is the need to use hot melt machine, the pipe ends after hot melt docking can be together.
Our high-quality products are widely used in petroleum, chemical, metallurgy, electric power, ship, natural gas, and pipeline industries. We have gained a good refutation among users. At the same time, our products are exported to Europe, the United States, the Middle East, Africa, and Southeast Asia, as well as other countries and regions.

1. Manufacturer Overview

Location Hebei,China
Year Established 2008
Annual Output Value US$10 Million - US$50 Million
Main Markets 15.00% North America
15.00% South America
15.00% Eastern Europe
15.00% Southeast Asia
15.00% Africa
15.00% Oceania
10.00% Mid East
Company Certifications ISO9001-2000;ISO9001-2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Tianjin
Export Percentage 91% - 100%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 10,000-30,000 square meters
No. of Production Lines 4
Contract Manufacturing
Product Price Range Average